Enviro 50-1578 technical manual Exhaust Box, slide the pipe

Page 17

Installation

INSTALLATION WITH EXTERIOR MOUNTED EXHAUST BLOWER:

The WINDSOR can be equipped with an externally mounted exhaust blower (PART #50-492). This optional kit will include all components necessary to install the exhaust blower on any external vertical wall surface.

Choose a location for your stove that meets the requirements stated in this manual and allows installation with the least amount of interference to house framing, plumbing, wiring, etc.

Included in the exterior mounted exhaust blower kit are: 1 - Exhaust blower housing box.

1 - Blower cover plate.

1 - Hardware bag

1.Open the left side of the unit and disconnect the exhaust blower wires from the harness. Remove the exhaust blower by undoing the six (6) 6mm (1⁄4”) hex head sheet metal screws that fasten the blower to the housing.

2.Remove the back grill from the exterior exhaust vent housing and remove the round cover plate installed on the blower housing.

3.Install the round cover plate over the gasketed opening in the stove where the exhaust motor was removed from.

4.Install the exhaust blower motor in the Exterior Vent Housing Box onto the exhaust blower housing.

Exhaust Motor

Cover Plate

Access Panel

Figure 17: Removing Exhaust Blower.

5.Follow the procedures for INSTALLATION - HORIZONTAL EXHAUST THROUGH WALL INSTALLATION. Place the unit in

the desired location. Cut the hole in the wall at the desired location. Install a wall thimble.

6.Drill holes in the wall thimble in the corresponding locations for wire and fresh air if needed. Install wire clamps and feed wire through the hole in the thimble into the house. Tighten clamp on wire and attach green ground wire (at the symbol) with the screw and star washer provided.

7.Attach a short or an adjustable section of 80mm (3”) of double wall pellet vent through the wall

thimble to the stove. Seal all joints with silicone. Maintain clearances to combustibles.

8. Apply

silicone to the

pipe in

Install blower

the Exhaust Box, slide the pipe

motor onto

exhaust blower

into the exhaust vent.

Mount

housings.

the Exhaust Box to the house.

 

Reinstall the back grill on the

 

Exterior Vent

Housing Box.

 

Apply normal venting practices

 

when

installing

the

vertical

Completed assembly.

vent pipe.

 

 

 

 

Figure 18: Exterior Exhaust Blower.

 

 

 

 

17

Image 17
Contents Windsor Table of Contents Safety Warnings & Recommendations Safety Warnings & Recommendations Safety Warnings & Recommendations Rating label is located on the back of the hopper InstallationWindsor Dimensions Windsor Specifications Depth 815mm Area Under Sundeck Exhaust 100mm With High Through Wall with Horizontal Termination Finally, extend the pellet Outside Vertical Installation Hearth Mount Side View Exhaust Box, slide the pipe To Supply Power to the Exhaust Blower Exhaust Blower Installation Vertical Termination Thermostat wire placement Special Notes Do not TroubleshootingExhaust motor will not function normally 200 F 93 C high limit temperature sensor has tripped Wiring Diagram Reference Description Part Number Parts List Components50-1577 Parts List Cast Components DiagramSCastteelParts Name of Owner Address Installation Data Sheet