THROUGH WALL VERTICAL INSTALLATION WITH EXHAUST BLOWER:

Refer to INSTALLATION - INSTALLATION WITH EXTERIOR MOUNTED EXHAUST BLOWER and INSTALLATION - OUTSIDE VERTICAL

INSTALLATIONS. Ensure that vent pipe is properly secured to wall using wall straps. Maintain clearances to combustibles on vent pipe as well as unit.

Rain cap - ensure cap is at least 900mm (3 ft) above the roof at the lowest point

Roof Sheathing

Storm Collar

Roof Flashing

Roof Rafters

Ceiling Joist

Vertical Vent Pipe

Exterior Wall

Sheathing

Outside Vent

Termination

Figure 20: Exhaust Blower Installation; Vertical Termination.

19

Image 19
Contents Windsor Table of Contents Safety Warnings & Recommendations Safety Warnings & Recommendations Safety Warnings & Recommendations Rating label is located on the back of the hopper InstallationWindsor Dimensions Windsor Specifications Depth 815mm Area Under Sundeck Exhaust 100mm With High Through Wall with Horizontal Termination Finally, extend the pellet Outside Vertical Installation Hearth Mount Side View Exhaust Box, slide the pipe To Supply Power to the Exhaust Blower Exhaust Blower Installation Vertical Termination Thermostat wire placement Special Notes Do not TroubleshootingExhaust motor will not function normally 200 F 93 C high limit temperature sensor has tripped Wiring Diagram Reference Description Part Number Parts List Components50-1577 Parts List Cast Components DiagramSCastteelParts Name of Owner Address Installation Data Sheet