American Water Heater ABCG3 instruction manual Sequence of Operation Flow Chart

Page 27

Sequence of Operation Flow Chart

Description of this flow chart can be found in the “SEQUENCE OF OPERATION” section found on page 26.

FIGURE 24.

27

Image 27
Contents Commercial gas water heaters Table Of Contents Approvals Safe Installation, Use and ServiceFire and Explosion Hazard General Safety InformationGrounding Instructions Precautions Hydrogen Gas FlammableQualifications Qualified Installer or Service AgencyIntroduction Abbreviations UsedElectronic Ignition Control Eliminator self-cleaning systemHigh Limit Switch Low Gas Pressure SwitchRecovery CAPACITIES, based on 80% efficiency Installation considerationsRough In Dimensions ROUGH-IN-DIMENSIONSClearances Locating the Water HeaterInstallation on Combustible Flooring Insulation BlanketCirculation pumps High Altitude Installations Installation Requirements Thermal Expansion Temperature-Pressure Relief ValveDishwashing Machines Closed Water SystemsContaminated Air Air RequirementsValve Discharge Pipe Requirements Unconfined Space Confined SpaceVenting Outdoor Air Through One Opening Multiple Heater ManifoldFresh Air Openings for Confined Spaces Outdoor Air Through Two OpeningsAir From Other Indoor Spaces Outdoor Air Through Two Vertical DuctsMultiple Gas Fired Tank-Type Heaters Technical Data VentingTechnical Data Venting Water heater installation Water Line ConnectionsValve Discharge Pipe Tube Inlet Installation Installation Diagrams Top Inlet/Outlet UsageHeater Wiring Gas Meter Size Natural Gases Only Gas Line Leak TestingGas Piping PurgingStart Up Prior to Start UpInitial Start Up Checking the Input Water Temperature AdjustmentChecking Venting Gas ValvesLighting & Operation Label Sequence of OperationSequence of Operation Flow Chart Maintenance To Drain the Water Heater Storage Tank Hot Water OdorAnode Rod Inspection Draining and FlushingExample Tank Cleanout ProcedureDeliming Using FLO-JUG Method Deliming SolventsChemical Hazard System Diagnostics Ignition Module SystemElectrical Servicing Operational Conditions High Water Temperature Shut Off SystemFor Your Information Start Up ConditionsTroubleshooting Qualified Service AgencyComplaint Cause Remedy User Water Piping DiagramsTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Manifold Kits Conditions and Exceptions Service and Repair ExpensesClaim Procedure ALL Other Parts