American Water Heater ABCG3 instruction manual MULTI-FLUE 3 Units with Horizontal Storage Tank

Page 46

LEGEND

MULTI-FLUE (3 UNITS) WITH HORIZONTAL STORAGE TANK

WARNING: THIS DRAWING SHOWS SUGGESTED

PIPING CONFIGURATION AND OTHER DEVICES;

CHECK WITH LOCAL CODES AND ORDINANCES

FOR ADDITIONAL REQUIREMENTS.

46

TEMPERATURE & PRESSURE

RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK TEMPERATURE CONTROL

DRAIN

HOT WATER TO FIXTURES

PIPE T&P TO

OPEN DRAIN

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

HOT WATER

RETURN

HEATER

HEATER

PIPE T&P TO

HEATER

PIPE T&P TO

PIPE T&P TO

 

OPEN DRAIN

 

OPEN DRAIN

OPEN DRAIN

 

 

 

STORAGE TANK

ALTERNATE LOCATION

FINISHED FLOOR

COLD WATER

SUPPLY

EXPANSION TANK

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

4.The Tank Temperature Control should be wired to and control the pump between the water heater(s) and the storage tank(s).

5.The water heater’s operating thermostat should be set 5 degrees F higher than the Tank Temperature Control.

Image 46
Contents Commercial gas water heaters Table Of Contents Safe Installation, Use and Service ApprovalsGeneral Safety Information Fire and Explosion HazardPrecautions Hydrogen Gas Flammable Grounding InstructionsAbbreviations Used Qualified Installer or Service AgencyIntroduction QualificationsLow Gas Pressure Switch Eliminator self-cleaning systemHigh Limit Switch Electronic Ignition ControlROUGH-IN-DIMENSIONS Installation considerationsRough In Dimensions Recovery CAPACITIES, based on 80% efficiencyLocating the Water Heater ClearancesInsulation Blanket Installation on Combustible FlooringCirculation pumps High Altitude Installations Installation Requirements Closed Water Systems Temperature-Pressure Relief ValveDishwashing Machines Thermal ExpansionAir Requirements Contaminated AirValve Discharge Pipe Requirements Confined Space Unconfined SpaceVenting Outdoor Air Through Two Openings Multiple Heater ManifoldFresh Air Openings for Confined Spaces Outdoor Air Through One OpeningOutdoor Air Through Two Vertical Ducts Air From Other Indoor SpacesTechnical Data Venting Multiple Gas Fired Tank-Type HeatersTechnical Data Venting Water Line Connections Water heater installationValve Discharge Pipe Installation Diagrams Top Inlet/Outlet Usage Tube Inlet InstallationHeater Wiring Purging Gas Line Leak TestingGas Piping Gas Meter Size Natural Gases OnlyPrior to Start Up Start UpInitial Start Up Gas Valves Water Temperature AdjustmentChecking Venting Checking the InputSequence of Operation Lighting & Operation LabelSequence of Operation Flow Chart Maintenance Draining and Flushing Hot Water OdorAnode Rod Inspection To Drain the Water Heater Storage TankDeliming Solvents Tank Cleanout ProcedureDeliming Using FLO-JUG Method ExampleChemical Hazard Ignition Module System System DiagnosticsElectrical Servicing Start Up Conditions High Water Temperature Shut Off SystemFor Your Information Operational ConditionsQualified Service Agency TroubleshootingComplaint Cause Remedy User Diagrams Water PipingTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Manifold Kits ALL Other Parts Service and Repair ExpensesClaim Procedure Conditions and Exceptions