American Water Heater ABCG3 instruction manual MULTI-FLUE 3 Units with Vertical Storage Tank

Page 45

MULTI-FLUE (3 UNITS) WITH VERTICAL STORAGE TANK

WARNING: THIS DRAWING SHOWS SUGGESTED

PIPING CONFIGURATION AND OTHER DEVICES;

CHECK WITH LOCAL CODES AND ORDINANCES

FOR ADDITIONAL REQUIREMENTS.

45

LEGEND

TEMPERATURE & PRESSURE

RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK TEMPERATURE CONTROL

DRAIN

HOT WATER TO FIXTURES

PIPE T&P TO

OPEN DRAIN

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

HEATER

HEATER

HEATER

PIPE T&P TO

PIPE T&P TO

PIPE T&P TO

OPEN DRAIN

OPEN DRAIN

OPEN DRAIN

FINISHED FLOOR

STORAGE

HOT WATER

 

RETURN

TANK

ALT. COLD WATER

 

CONNECTION

 

COLD WATER

 

SUPPLY

 

EXPANSION TANK

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

4.The Tank Temperature Control should be wired to and control the pump between the water heater(s) and the storage tank(s).

5.The water heater’s operating thermostat should be set 5 degrees F higher than the Tank Temperature Control.

Image 45
Contents Commercial gas water heaters Table Of Contents Approvals Safe Installation, Use and ServiceFire and Explosion Hazard General Safety InformationGrounding Instructions Precautions Hydrogen Gas FlammableIntroduction Qualified Installer or Service AgencyAbbreviations Used QualificationsHigh Limit Switch Eliminator self-cleaning systemLow Gas Pressure Switch Electronic Ignition ControlRough In Dimensions Installation considerationsROUGH-IN-DIMENSIONS Recovery CAPACITIES, based on 80% efficiencyClearances Locating the Water HeaterInstallation on Combustible Flooring Insulation BlanketCirculation pumps High Altitude Installations Installation Requirements Dishwashing Machines Temperature-Pressure Relief ValveClosed Water Systems Thermal ExpansionContaminated Air Air RequirementsValve Discharge Pipe Requirements Unconfined Space Confined SpaceVenting Fresh Air Openings for Confined Spaces Multiple Heater ManifoldOutdoor Air Through Two Openings Outdoor Air Through One OpeningAir From Other Indoor Spaces Outdoor Air Through Two Vertical DuctsMultiple Gas Fired Tank-Type Heaters Technical Data VentingTechnical Data Venting Water heater installation Water Line ConnectionsValve Discharge Pipe Tube Inlet Installation Installation Diagrams Top Inlet/Outlet UsageHeater Wiring Gas Piping Gas Line Leak TestingPurging Gas Meter Size Natural Gases OnlyStart Up Prior to Start UpInitial Start Up Checking Venting Water Temperature AdjustmentGas Valves Checking the InputLighting & Operation Label Sequence of OperationSequence of Operation Flow Chart Maintenance Anode Rod Inspection Hot Water OdorDraining and Flushing To Drain the Water Heater Storage TankDeliming Using FLO-JUG Method Tank Cleanout ProcedureDeliming Solvents ExampleChemical Hazard System Diagnostics Ignition Module SystemElectrical Servicing For Your Information High Water Temperature Shut Off SystemStart Up Conditions Operational ConditionsTroubleshooting Qualified Service AgencyComplaint Cause Remedy User Water Piping DiagramsTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Manifold Kits Claim Procedure Service and Repair ExpensesALL Other Parts Conditions and Exceptions