MULTI FLUE (2 UNITS) WITH BOOSTER TWO TEMPERATURE

WARNING: THIS DRAWING SHOWS SUGGESTED

PIPING CONFIGURATION AND OTHER DEVICES;

CHECK WITH LOCAL CODES AND ORDINANCES

FOR ADDITIONAL REQUIREMENTS.

43

PIPE T&P TO

PIPE T&P TO

OPEN DRAIN

OPEN DRAIN

 

PRE-HEATER

PRE-HEATER

FINISHED FLOOR

MUST BE IDENTICAL HEATERS

LEGEND

TEMPERATURE & PRESSURE

RELIEF VALVE

PRESSURE RELIEF VALVE

CIRCULATING PUMP

TANK TEMPERATURE CONTROL

DRAIN

HOT OUTLET

AT STORED

TEMPERATURE

BOOSTER RETURN (IF USED)

PIPE T&P TO

OPEN DRAIN

BOOSTED

WATER

OUTLETCOLD WATER

SUPPLY

TYPICAL

BOOSTER

HEATER

EXPANSION TANK

FULL PORT BALL VALVE

CHECK VALVE

TEMPERATURE GAGE

WATER FLOW SWITCH

HOT WATER

RETURN

NOTES:

1.Preferred piping diagram.

2.The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system.

3.Service valves are shown for servicing unit. However, local codes shall govern their usage.

Image 43
Contents Commercial gas water heaters Table Of Contents Approvals Safe Installation, Use and ServiceFire and Explosion Hazard General Safety InformationGrounding Instructions Precautions Hydrogen Gas FlammableQualifications Qualified Installer or Service AgencyIntroduction Abbreviations UsedElectronic Ignition Control Eliminator self-cleaning systemHigh Limit Switch Low Gas Pressure SwitchRecovery CAPACITIES, based on 80% efficiency Installation considerationsRough In Dimensions ROUGH-IN-DIMENSIONSClearances Locating the Water HeaterInsulation Blanket Installation on Combustible FlooringCirculation pumps High Altitude Installations Installation Requirements Thermal Expansion Temperature-Pressure Relief ValveDishwashing Machines Closed Water SystemsAir Requirements Contaminated AirValve Discharge Pipe Requirements Confined Space Unconfined SpaceVenting Outdoor Air Through One Opening Multiple Heater ManifoldFresh Air Openings for Confined Spaces Outdoor Air Through Two OpeningsAir From Other Indoor Spaces Outdoor Air Through Two Vertical DuctsMultiple Gas Fired Tank-Type Heaters Technical Data VentingTechnical Data Venting Water Line Connections Water heater installationValve Discharge Pipe Tube Inlet Installation Installation Diagrams Top Inlet/Outlet UsageHeater Wiring Gas Meter Size Natural Gases Only Gas Line Leak TestingGas Piping PurgingPrior to Start Up Start UpInitial Start Up Checking the Input Water Temperature AdjustmentChecking Venting Gas ValvesLighting & Operation Label Sequence of OperationSequence of Operation Flow Chart Maintenance To Drain the Water Heater Storage Tank Hot Water OdorAnode Rod Inspection Draining and FlushingExample Tank Cleanout ProcedureDeliming Using FLO-JUG Method Deliming SolventsChemical Hazard Ignition Module System System DiagnosticsElectrical Servicing Operational Conditions High Water Temperature Shut Off SystemFor Your Information Start Up ConditionsQualified Service Agency TroubleshootingComplaint Cause Remedy User Water Piping DiagramsTemperature & Pressure Temperature & Pressure Relief Valve Circulating Pump Multi Flue 2 Units Multi Flue 2 Units with Vertical Storage Tank Multi Flue 2 Units with Vertical Storage Tank Return from Multi Flue 2 Units TWO Temperature Multi Flue 2 Units with Booster TWO Temperature MULTI-FLUE 3 Units MULTI-FLUE 3 Units with Vertical Storage Tank MULTI-FLUE 3 Units with Horizontal Storage Tank Multi Flue Flue 4 Units MULTI-FLUE 4 Units with Vertical Storage Tank MULTI-FLUE 4 Units with Horizontal Storage Tank Manifold Kits Conditions and Exceptions Service and Repair ExpensesClaim Procedure ALL Other Parts