_!:_:_:::__:_:__";:;_"::::::::¸:::::::I!i _!_!I!__i:'::!!I!_!i:_!:_;ii:_:i::'::i:i:__::'':i::i:__.E"":"::i::':'__$_:i:F.:i:_::_:':i:__i:i:::i::_i
Please read and comply with the warnings and reinforcement instructions on page 24. They apply to
Header Wall | |
| |
| 2x4 Support |
Header
Bracket
BracketPlacement
of Door
Bracket
Vertical
Garage Door
Horizontal and vertical reinforcement is
needed for lightweight garage doors
(fiberglass, aluminum, steel, door with glass panel, etc.).
(Not Provided)
Nut
|
| 5/16" |
| ||
|
| I | I | Top o! Door | |
|
|
| |||
Door |
| _ | (Inside | Garage) | |
|
|
| |||
|
|
|
| _ | of Door |
|
|
|
| Top Edge | |
|
|
|
| __ | Optior_ |
|
|
|
|
| Placement |
|
| I | I |
|
|
exposed lramlng | or for |
|
| ||
the optional Installation, | i | L | Carriage | Bolt | |
For a door with no | |||||
use | lag |
|
|
|
|
screws(not provided)
•Center the bracket on the top of the door, in line with the header bracket as shown. Mark holes.
•Drill 5/16" pilot holes and fasten the door bracket with hardware supplied.
If the door has no exposed framing, drill 3/16" pilot holes and fasten the bracket with
The door bracket may be installed on the top edge of the door if required for your installation. (Refer to the dotted line optional placement drawing.) Drill 3/16" pilot holes and substitute
Hardware Shown Actual Size
© ©
25