Care and cleaning 21
Folding down the heating element
1.Remove the shelf support rails.
2.Hold the heating element with the two
hands at the front
3. Pull it forwards against the spring pres- sure and out along the support on both sides.
4.The heating element folds down. The oven ceiling is ready to clean.
Installing the heating element
1.Install the heating element in opposite sequence.
Install the heating element correctly on the two sides above the support on the inner wall of the oven.
2. Insert shelf support rails.
Telescopic shelf runners
To insert the telescopic shelf runners, first remove the shelf support rails (refer to “Removing the shelf support rails”).
Installing the telescopic runners
1. Install the telescopic shelf runners at the back of the side wall.
2. Push the front of the telescopic shelf run- ners to the side wall.
Make sure that the retaining pins on the telescopic shelf runners point to the front.
Removing the telescopic runners
Remove the telescopic runners in opposite sequence.
Oven lamp
WARNING!
There is a danger of electrical shock!