KitchenAid Dual Fuel Convection Range Wiring Diagrams, Complete Installation, Cooktop Schematic

Page 13

Complete Installation

1.Check that all parts are now installed. If there is an extra part, go back through the steps to see which step was skipped.

2.Dispose of/recycle all packaging materials.

3.Check that range is correctly positioned in countertop cutout and that the range is level. See “Level Range.”

4.Check that the specified distances to cabinet surfaces were maintained. See “Location Requirements.”

5.Check that burner caps are positioned properly on sealed burner bases.

6.Check that backguard or island trim is installed. (If horizontal clearance to combustible materials behind cooking surface is less than 1" [2.5 cm]).

7.Check that the range is connected only to the type of gas for which it is certified for use.

8.Use a mild solution of liquid household cleaner and warm water to remove waxy residue caused by shipping material. Dry thoroughly with a soft cloth. For more information, see the “Range Care” section of the Use and Care Guide.

9.Read “Range Use” in the Use and Care Guide.

10.Turn on surface burners and oven. See the Use and Care Guide for specific instruction on range operation.

If range does not operate, check the following:

Household fuse has not blown, or circuit breaker has not tripped.

Gas valves are turned to the “open” position.

If the gas supply line shutoff valve is open, turn to “closed” and contact a qualified technician.

Electrical supply is connected.

See “Troubleshooting” in the Use and Care Guide.

WIRING DIAGRAMS

CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.

The power cord on this appliance is equipped with a 3 prong grounding plug which mates with standard 3 prong grounding-type plug. Verify proper operation after servicing.

Cooktop Schematic

L1

 

 

N L2

 

 

 

R

BK

 

W

W

 

 

 

 

GND

W

W

 

 

 

R

GR

W

 

 

 

SPARK

 

 

 

MODULE

 

VALVE SWITCHES

Y OR BR (6) PLCS

IGNITER ELECTRODES

13

Image 13
Contents 9760618B Pour utilisation résidentielle seulementTable DES Matières Range SafetyWhat to do if YOU Smell GAS Tools and Parts Installation RequirementsLocation Requirements Product Dimensions Cabinet Dimensions Mobile Home Additional Installation RequirementsMobile home installations require Electrical Requirements Canada Only Electrical Requirements U.S.A. OnlyElectrical Connection Gas Supply Line Gas Supply RequirementsType of Gas Unpack Range Installation InstructionsLevel Range Electrical Connection Options Chart Install Anti-Tip BracketIf your home has Go to Section Wire Power SupplyAttach Backguard or Island Trim Wire Cable from Home Power SupplyAttaching the Backguard Attaching the Island TrimElectronic Ignition System Make Gas ConnectionReinstall Bottom Vent Complete Installation Wiring DiagramsCooktop Schematic If range does not operate, check the followingOven Schematic Page Votre sécurité et celle des autres est très importante Sécurité DE LA CuisinièreOutillage et pièces Exigences DinstallationOutillage nécessaire Pièces nécessairesDimensions de lappareil Exigences demplacementDégagements de séparation à respecter Spécifications de l’installation électriqueType de gaz Canalisation de gaz Spécifications de l’alimentation en gazDéballage de la cuisinière Instructions DinstallationRéglage de laplomb de la cuisinière Fixation du dosseret ou de la garniture en îlot Installation de la bride antibasculementFixation du dosseret Fixation de la garniture en îlot Raccordement à la canalisation de gazCompléter le raccordement Système dallumage électronique Achever linstallation Réinstallation de lévent du fondSi la cuisinière ne fonctionne pas, contrôler ce qui suit Schéma de câblage de la table de cuisson Schémas DE CâblageSchéma de câblage du four All rights reserved