Installation
Before You Begin
Tools and Parts Needed • 50 Amp Power Supply Cord Kit (not necessary for Canadian installations)
•Measuring Tape
•Phillips Head Screwdriver
•
•Pencil
•
•Screws (2) and Anchors (2) for
•Level
•Drill and Drill Bit
•Safety Gloves and Goggles
•Tape (optional)
•Cloth or Cardboard (optional - to protect floor)
Additional Parts Needed For Hard Wire Installations
Parts Included
•Flexible Conduit (for Hard Wire Installation Only)
•Torque Wrench (for Hard Wire Installation Only)
•Note:
Power Supply Cord Kit not necessary for Hard Wire Installations
•
•Terminal Lugs (for use with Hard Wire Installations) (not necessary for Cana- dian installations)
Cabinet Requirements
This unit is designed for installation near adjacent walls and projecting surfaces constructed of combustible materials. Allow a minimum of 30 inches (76.2 cm) between cabinets where range is to be installed (0.47” (12 mm) clearance from range sidewall to cabinet required in Canada).
30” (76.2 cm) Minimum between cabinets
Figure 1: Cabinet Clearances
Required Clearances
These clearance instructions were determined using Standard American cabinets. Standard base cabinets measure 36 inch (91.4 cm) high x 24 inch (60.9 cm) deep. Cabinets over the cooking surface and cabinets adjacent to those over the cook-