Middleby Marshall Oven owner manual Transition Assembly, Conveyor Motor and Drive Chain Assembly

Page 21

SECTION 2 INSTALLATION

6.Slide the top transition panel into place. Then, slide the two transition side panels into place. See Figure 2-29.

5.For a TANDEM, DOUBLE TANDEM, or TRI TANDEM oven installation, skip ahead to the next section. For a QUAD TANDEM oven installation, continue on to Step 6.

Latches

7.If the four latches are not already attached to the side and top transition panels, attach them in place as shown in Figure 2-29.

Fasten the latches on the side and top panels to hold the panels in place.

8.LOOSELY attach the conveyor drive motor to the end wall of the oven, as shown in Figure 2-30.

9.Assemble the conveyor drive chain in place on the motor and conveyor drive sprockets.

10.Position the motor to adjust the tension of the drive chain. The deflection of the chain should not exceed 1/4” (6mm). Then, tighten the motor in place.

Figure 2-29

Transition

Assembly

Latches

Figure 2-30

Conveyor Motor and Drive Chain Assembly

11.Assemble the end plugs and motor housing onto the oven.

TANDEM AND DOUBLE TANDEM OVENS ONLY: Assemble the conveyor crumb trays and conveyor extension covers onto the oven.

2-21

Image 21
Contents UNLOADING/UNPACKING Section InstallationVentilation Hood Dimensions Recommendations only II. INSTALLATION, PREPARATION, and SupplyRequirements III. Ventilation SystemRecommendations Other Ventilation ConcernsInstallation KIT Dimensions and Data PS360L Tandem Dimensions and Data PS360WB Double Tandem Dimensions and Data PS360U Tri Tandem Dimensions and Data PS360WB-U Tri Tandem Dimensions and Data PS360U Quad Tandem Dimensions and Data PS360WB-U Quad Tandem IV. Thermocouple Installation Thermocouple Installation LocationsPlacing the Thermocouple Leads Thermocouple Lead Connections Exploded View Upper Oven Stand AssemblyOven Positioning and Alignment Cooling Fan RemovalJoining the Oven Bodies Bolts and Spacers Aligning the Ovens for AssemblyTrim Strip Positioning Checking Track Rail Alignment22a Support Brackets Lower Oven Transition Frame PlacementReplacing Transition Frame Installing the Transition Floor Panel25a Installing the Conveyor Frame and BeltConveyor Link Orientation Inside Master LinksOutside Master Links Conveyor Motor and Drive Chain Assembly Transition AssemblyGAS Supply Electrical Supply Do not USE Conduit For GroundOven Rough-In VI. Electrical Connection Typical Oven Data Plate Models PS360/PS360WB Flexible Hose Connector Installation During Pressure Testing Note ONE FollowingVII. GAS Supply for GAS Heated Ovens VIII. Preparation for Various Gases For USE with Natural GASFor USE with Liquid LP GAS GAS Type and Pressure Label Burner/Piping AssemblyIX. Changing Orifices Volumetric MethodXI. Variations of Rated Supply Pressures To Check GAS Supply PressureOrifice Manifold Pressure Method Special Notices