Middleby Marshall Oven owner manual Checking Track Rail Alignment, Trim Strip Positioning

Page 16

SECTION 2

INSTALLATION

5.Check the alignment of the track rails using a straightedge. The rails MUST BE LEVEL across the gap between the ovens. If necessary, adjust the oven legs to align the track rails.

Figure 2-19

Checking Track Rail Alignment

6.Tighten all of the attaching bolts. Check that the mating edges of the ovens align properly. If gaps appear between the tops of the ovens, it will be necessary to loosen the connecting bolts and realign the ovens.

IMPORTANT: If it is necessary to realign the ovens, remember to re-check the alignment of the track rails.

7.Attach the front trim strip between the two ovens, as shown in Figure 2-20.

Trim strip

Figure 2-20

Trim Strip Positioning

8.Perform one of the following, as appropriate:

For PS360/360WB Tandem and Double Tandem installations, skip ahead to the INSTALLING THE CONVEYOR FRAME AND BELT section (Page 2-19).

For PS360/360WB Tri Tandem installations, perform Steps 1-7 again to attach the third oven to the two that have just been assembled. Then, skip ahead to the

INSTALLING THE CONVEYOR FRAME AND BELT section (Page 2-19).

For PS360/360WB Quad Tandem installations, perform Steps 1-7 again to attach the two remaining ovens to each other. Then, continue on to Step 9 to attach the center (transition) section.

2-16

Image 16
Contents Section Installation UNLOADING/UNPACKINGII. INSTALLATION, PREPARATION, and Supply Ventilation Hood Dimensions Recommendations onlyIII. Ventilation System RequirementsRecommendations Other Ventilation ConcernsInstallation KIT Dimensions and Data PS360L Tandem Dimensions and Data PS360WB Double Tandem Dimensions and Data PS360U Tri Tandem Dimensions and Data PS360WB-U Tri Tandem Dimensions and Data PS360U Quad Tandem Dimensions and Data PS360WB-U Quad Tandem Thermocouple Installation Locations IV. Thermocouple InstallationPlacing the Thermocouple Leads Thermocouple Lead Connections Assembly Exploded View Upper Oven StandCooling Fan Removal Oven Positioning and AlignmentJoining the Oven Bodies Aligning the Ovens for Assembly Bolts and SpacersChecking Track Rail Alignment Trim Strip PositioningTransition Frame Placement 22a Support Brackets Lower OvenInstalling the Transition Floor Panel Replacing Transition FrameInstalling the Conveyor Frame and Belt 25aInside Master Links Conveyor Link OrientationOutside Master Links Transition Assembly Conveyor Motor and Drive Chain AssemblyDo not USE Conduit For Ground GAS Supply Electrical SupplyOven Rough-In VI. Electrical Connection Typical Oven Data Plate Models PS360/PS360WB During Pressure Testing Note ONE Following Flexible Hose Connector InstallationVII. GAS Supply for GAS Heated Ovens For USE with Natural GAS VIII. Preparation for Various GasesFor USE with Liquid LP GAS Burner/Piping Assembly GAS Type and Pressure LabelVolumetric Method IX. Changing OrificesTo Check GAS Supply Pressure XI. Variations of Rated Supply PressuresOrifice Manifold Pressure Method Special Notices