Middleby Marshall Oven owner manual VI. Electrical Connection

Page 23

SECTION 2

INSTALLATION

VI. ELECTRICAL CONNECTION

Check the oven data plate before making any electric supply connections. Electric supply connections must agree with data on the oven data plate. A typical oven data plate is shown in Figure 2-34 (on Page 2-24).

NOTE: When the oven is installed, it must be electrically grounded in accordance with current IEC/CEE requirements and also with local codes.

The electrical installation, including the service connection, must comply with current IEC/CEE requirements and to local codes. The installation must undergo a complete electrical check before operating the oven.

Special attention must be given to the polarity of the supply when connecting to oven input terminals.

All connections are made at one common connection at the back of each oven. Refer to Figures 2-32 and 2-33.

NOTE: At the installation location, it is required that the electrical supply for each oven incorporates a main circuit breaker (not furnished). The circuit breaker must have 3mm contact gaps breaking all poles of the supply.

WARNING: If your electrical supply has fast-acting circuit breakers, then the initial starting current of the blower motors in Model PS360WB-U and PS360WB-L may trip the breakers. It is suggested to use slow-acting circuit breakers with these models.

For further electrical information, refer to the wiring diagram.

WARNING: The connections to the exhaust system, electrical supply, and gas supply must follow the installation instructions. Initial start-up of the oven can be performed only by an authorized agent.

Figure 2-32

Figure 2-33

Junction Connection Box (Lower Oven)

Junction Connection Box (Upper Oven)

3/4” (19mm) pipe for gas

oven connection

3/4” (19mm) pipe for gas oven connection

2-23

Image 23
Contents UNLOADING/UNPACKING Section InstallationVentilation Hood Dimensions Recommendations only II. INSTALLATION, PREPARATION, and SupplyOther Ventilation Concerns III. Ventilation SystemRequirements RecommendationsInstallation KIT Dimensions and Data PS360L Tandem Dimensions and Data PS360WB Double Tandem Dimensions and Data PS360U Tri Tandem Dimensions and Data PS360WB-U Tri Tandem Dimensions and Data PS360U Quad Tandem Dimensions and Data PS360WB-U Quad Tandem Placing the Thermocouple Leads IV. Thermocouple InstallationThermocouple Installation Locations Thermocouple Lead Connections Exploded View Upper Oven Stand AssemblyJoining the Oven Bodies Oven Positioning and AlignmentCooling Fan Removal Bolts and Spacers Aligning the Ovens for AssemblyTrim Strip Positioning Checking Track Rail Alignment22a Support Brackets Lower Oven Transition Frame PlacementReplacing Transition Frame Installing the Transition Floor Panel25a Installing the Conveyor Frame and BeltOutside Master Links Conveyor Link OrientationInside Master Links Conveyor Motor and Drive Chain Assembly Transition AssemblyOven Rough-In GAS Supply Electrical SupplyDo not USE Conduit For Ground VI. Electrical Connection Typical Oven Data Plate Models PS360/PS360WB VII. GAS Supply for GAS Heated Ovens Flexible Hose Connector InstallationDuring Pressure Testing Note ONE Following For USE with Liquid LP GAS VIII. Preparation for Various GasesFor USE with Natural GAS GAS Type and Pressure Label Burner/Piping AssemblyIX. Changing Orifices Volumetric MethodOrifice Manifold Pressure Method XI. Variations of Rated Supply PressuresTo Check GAS Supply Pressure Special Notices