Grindmaster LCD-2R, LCD-2A instruction manual Installation, Water Inlet Connection, Water hook-up

Page 5

Installation

Water Inlet Connection:

The National Sanitation Foundation requires the following for an NSF approved water hook-up:

1.A quick disconnect water connection or enough coiled tubing so that the machine can be moved for cleaning underneath.

2.An approved backflow prevention device, such as a double check valve to be installed between the machine and water supply. A 3/8" male flare adapter is provided on the back of the machine for hook-up to water supply. On units plumbed to permanent water line, installation of a water filter/softener system is recommended to prevent lime and scale build up in the machine. On units pumping from remote water container, filtered water is recommended to prevent lime and scale buildup in the machine.

3.Water pipe connections and fixtures directly connected to potable water supply shall be sized, installed and maintained in accordance with Federal, State, and Local codes.

Water hook-up:

1.Install the (2) front 4" legs to provide approximately 1/2" clearance with the bottom of the machine.

2.Install drain tray bracket to the front of the machine by sliding the bracket between the front 4" legs and the bottom of the machine. Tighten the front 4" legs to secure the drain tray bracket.

3.Install the (2) back 4" legs and tighten.

4.Install the plastic drain tray onto the drain tray bracket. (Note: The drain tray is provided with a removable plug to allow for plumbing the drain tray to a drain.)

5.Install a 3/8 ID flexible water supply hose to the 3/8” male flare fitting on the back of the machine. Ensure the water supply hose has sufficient length to allow the machine to be moved for cleaning or service. Supplying hot water to the machine will greatly increase the capacity of the machine. The use of copper tubing is required to prevent rupture when using a hot water supply. A maximum inlet water temperature of 160°F is recommended.

6.Ensure that the water supply to the machine is within 20 to 100psi. Install a pressure regulator if pressure is too high.

WARNING: ELECTRIC SHOCK HAZARD

Only qualified service personnel should perform installation of this appliance. Improper installation could result in serious injury or death.

WARNING: ELECTRIC SHOCK HAZARD

Never use the ground conductor as a neutral conductor. Serious injury or death could occur in the event of a fault condition.

WARNING: ELECTRIC SHOCK HAZARD Always disconnect power to the machine before servicing or cleaning. Risk of electric shock is present which can cause serious injury or death.

Page 5

Model LCD-2R and LCD-2A

 

 

Image 5
Contents Grindmaster Corporation Introduction User Replaceable Parts Model LCD-2R and LCD-2A Water hook-up InstallationWater Inlet Connection Figure B Backside of access panelOn models with manual dispense pull handle switches How to Dispense a Cup of CoffeeBag-in-Box Hook-up To flush dispense spoutsUser Programming Instructions Engineer Mode Engineer Program SettingsMachine Fault Codes Water overheat Reset SystemLeak Inlet valve leakImportant Note Regarding Portion Override Button Programming Guide for Calibration of Mix RatioDispensed Water Programming Guide for Calibration of Mix Ratio WorksheetDispensed Concentrate Mix Ratio CalculationFigure E Weekly Cleaning InstructionsPurging Machine of all Water for Shipment in Cold Areas Service and CleaningDraining the Tank Control Board Diagnostic LEDs Troubleshooting GuideMachine does not Power UP Problem/Cause RemedyWater Continues to Drip from Dispense Spout 21752/3&% Grindmaster Corporation Form # AM-328-04 63543