SCCG50 & SCCP50 Service Manual
18.Remove two screws holding freezing compartment brace to cabinet, lift brace up.
Brace
19.Lift evaporator platen up and tilt back enough for bin assembly to clear the base.
23. Lift bin assembly off the base.
Note: Prop evaporator assembly up. A 3' length of 3/4" PVC tubing with one end inserted into the cup mold and the other against the base will hold it up.
The hot gas valve, fan motor, condenser and compressor are now exposed for service.
Air Baffle
20.Remove air baffle.
21.Unplug 7 wire harness connector (at back of bin).
22.Remove 1 screw at each corner of the base.
Chassis Shown in Front of Bin Assembly
June 2008
Page 31