GE ZV830 Connect Electrical, Install Duct Covers, Verify that power is turned off at the source

Page 12

Installation Instructions

INSTALLATION—VENTED TO THE OUTSIDE

6 CONNECT ELECTRICAL

Verify that power is turned off at the source.

WARNING:If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L. approved anti-oxidant compound and aluminum-to-copper connectors.

Remove the 6 screws on the junction box cover and the knockout on the top or left side.

Junction

box cover

Secure the house wiring to the junction box with a strain relief.

7 INSTALL DUCT COVERS

Remove protective plastic

covering.Mounting screws

Place the decorative duct

covers on top of the hood.

NOTE: The inside duct piece has vent holes on one end.

The holes are intended for use when the hood is

installed for recirculating purposes. Slide the inside end into the outer piece; the vent holes should not be visible in this installation.

The inside duct piece must slip into the folded ends of the outer section.

Upper

Duct cover

support bracket

duct cover

 

Lower duct

 

cover

 

Duct attachment

Lower duct cover seat

tabs

Connect the white lead to the branch circuit white lead.

Connect the black lead to the branch circuit black lead.

Connect the green/yellow lead to the branch circuit green lead or bare ground lead.

Secure all the connections with wire nuts on each electrical connector.

Push the wires into the junction box and replace the cover. Be sure the wires are not pinched.

Secure the junction box cover with the 6 original screws.

12

Extend the inner duct upward to the ceiling bracket .

Screw holes

Press up on the front corners of the filter cover panel to unlock. Lower the panel to access the filter.

Locate the screw holes on the inside front edge of the opening. Install 2 screws to secure the duct cover to the hood.

Image 12
Contents Instructions d’installation Instrucciones de instalaciónRead and Save These Instructions Before YOU Begin Completion Time 1 to 3 HoursRead these instructions completely and carefully Contents Installation OptionsPower Supply Accessory Duct CoverAdvance Planning Duct Fittings Flexible ductingDo not use flexible plastic ducting Remove the Packaging Tools and Materials Required not SuppliedDetermine Installation Height AccessoriesWall Mount ZV830 Installation Heights PossibleCheck Installation Hardware Locate and count Screws Duct cover28-7/8 ″ 10-7/8 ″INSTALLATION-VENTED to the Outside DUCTWORK, Wiring LocationsInstall Framing for Hood Support House Wiring LocationInstall Hood Mounting Screws Install Duct BracketMount the Hood Secure the bracket to the wallConnect Ductwork Install Duct Covers Verify that power is turned off at the sourceConnect Electrical Install Filters Finalize InstallationINSTALLATION-RECIRCULATING Tape the template in position along the penciled lineImportant Framing must be capable of supporting 100 lbs Check to be sure the mounting screws are horizontally level Outlet Hold the assembly against Duct bracket Size and CUT Duct PieceSecure the junction box cover with the 6 original screws Remove protective plasticCovering Place the decorative duct Covers on top of the hoodRemove all tape and packing material Installation Instructions Installation Instructions Lisez ET Conservez CES Instructions Avant DE Commencer AvertissementAvertissement Pour Réduire Avertissement Afin DE RéduireDimensions ET Intervalles Options D’INSTALLATIONTable DES Matières 28 cm 10-7/8 poAccessoire Cache Conduit PlanificationAlimentation Raccords DE Canalisation ’utilisez PAS de conduit en plastique flexibleOutils ET Matériaux Nécessaires Retirer L’EMBALLAGENON Fournis Serre-filsDéfinition DE LA Hauteur ’INSTALLATION AccessoiresSupport mural ZV830 Hauteurs d’installation HauteurVérification DU Matériel D’INSTALLATION Repérez et comptez les visINSTALLATION-VENTILÉ Vers L’EXTÉRIEUR Emplacement DES Câbles DE LA MaisonConduit de plafond Conduit muralInstaller LE Support DE Canalisation Installez Les vis Trou de ligne médianeMonter LA Hotte Fixez le support sur le murConnecter LA Canalisation Flux d’airVérifiez que l’alimentation est coupée à la source Cache de Boîte à bornesSupport de cache Conduit Trous de visInstaller LES Filtres Terminer L’INSTALLATIONINSTALLATION- Recyclage Monter LA Hotte Mesurer ET Couper LE Conduit Les sorties de la hotteLongueur Conduit Du déflecteurConnecter LES Parties Électriques CacheSupérieur Cache conduit Inférieur Vérifiez que l’alimentation est coupée à la sourceInstaller LES Filtres Instructions d’installation Instructions d’installation Instructions d’installation Guarde Estas Instrucciones Antes DE Empezar PrecauciónAdvertencia Tiempo para la instalación 1 a 3 horasContenidos Opciones DE Instalación10-7/8 Altura Hasta el 24 Mín 30 Máx 18-7/8 29-7/8Planificación Previa Fuente DE EnergíaAccesorio DE Cubierta DE Conducto Instrucciones de conexión a tierraDel ducto Dimensiones Equivalente Utilizada Total Accesorios Para ConductosLongitud Pieza Longitud CantidadHerramientas Y Materiales Requeridos Quite EL EnvoltorioNo Incluido Establezca LA Altura DE Instalación AccesoriosAlturas de instalación De montaje de pared de ZV830 Altura deControle LOS Elementos Para LA Instalación INSTALACIÓN-VENTILACIÓN Hacia EL Exterior Ubicación DE LOS Conductos Y CableadoInstale EL Armazón Para EL Soporte DE LA Campana Ubicación DE Cableado DomésticoInstale LA Campana Instale LOS Tornillos DE Montaje DE LA CampanaQuite la plantilla Instale EL Soporte DEL ConductoConecte EL Conducto Instale LAS Cubiertas DE LOS Conductos Instale LOS Filtros Finalice LA InstalaciónOrificios para Tornillos INSTALACIÓN-RECIRCULACIÓN Ubicación delCableado Doméstico El cielorrasoPencil Line Indicating Longitud De medidaQuite la tapa protectora de Plástico Orificios de ventilación serán visibles en esta instalaciónCubierta de conducto i nferior Instale LOS Filtros Notas Notas GE Consumer & Industrial Para servicio técnico local Monogram en su área, llame al
Related manuals
Manual 40 pages 46.91 Kb

ZV830 specifications

The GE ZV830 is a groundbreaking and sophisticated addition to the lineup of kitchen appliances, designed to elevate both functionality and aesthetics. Packed with a range of advanced features, the ZV830 stands out as a state-of-the-art microwave that not only meets but exceeds modern culinary demands.

One of the standout characteristics of the GE ZV830 is its sleek and modern design, which seamlessly integrates into any kitchen decor. The appliance features a stainless-steel finish that is not only visually appealing but also easy to clean, making it a practical choice for busy homeowners. The unit is designed for installation over a range or cooktop, freeing up counter space while providing powerful cooking capabilities.

The ZV830 is equipped with a robust 1.7 cubic feet capacity, providing ample space for cooking large dishes or multiple items simultaneously. This microwave offers an impressive 1,000 watts of cooking power, ensuring quick and efficient heating, defrosting, and cooking of food.

One of the key technologies implemented in the GE ZV830 is its sensor cooking feature. This advanced technology allows the microwave to automatically adjust cooking times and power levels based on the moisture released from the food. As a result, users can achieve perfectly cooked meals without the guesswork traditionally associated with microwave cooking.

Additionally, the GE ZV830 boasts a range of convenient cooking presets and auto-reheat options, streamlining meal preparation. Features such as popcorn settings and pizza reheating options make it a versatile tool for any kitchen. The unit also includes a dedicated steam function, which is perfect for health-conscious individuals looking to prepare steamed vegetables easily.

Highly regarded for its user-friendly interface, the GE ZV830 includes a large LED display that provides clear visibility of cooking settings and times. The straightforward keypad allows for easy input, making it accessible for all users, including those less familiar with kitchen technology.

Furthermore, the GE ZV830 is designed with safety in mind. It includes child lock features to prevent unintended use, offering peace of mind for families. In conclusion, the GE ZV830 is an exemplary microwave that combines design, performance, and innovative technology to enhance the cooking experience. Its advanced features and user-centric design make it a valuable addition to any modern kitchen.