GE ZV830 INSTALLATION-VENTED to the Outside, DUCTWORK, Wiring Locations, House Wiring Location

Page 9

Installation Instructions

INSTALLATION—VENTED TO THE OUTSIDE

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

Locate the template packed with the literature.

Measure 36from the floor to the top of the cooking surface. Add hood installation height determined on page 7. Mark that location.

Use a level to draw a straight pencil line on the wall.

5-1/2” centerline to wallFOR CEILING VENT DUCTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5-1/2”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wall vent

 

 

House Wiring

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ceiling

 

 

 

 

27-3/4” min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Location

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

above

 

 

 

 

 

 

 

8-1/2” dia. hole

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

height

 

 

 

 

 

 

 

 

 

 

 

1-1/4

 

 

 

 

 

 

 

 

 

 

 

 

1-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10-1/16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

REAR WALL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOUNTING TEMPLATE

 

 

 

 

 

 

 

18”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9-7/16

 

15-7/16

 

 

 

 

 

 

 

 

 

15-7/16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9-7/16

 

 

 

 

 

 

 

 

 

 

Min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installation Height

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installation Height

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Align Bottom Edge With

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Align Bottom Edge With

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pencil Line Indicating

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pencil Line Indicating

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Bottom of Hood

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Bottom of Hood

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tape the template in position along the penciled line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Ceiling ducting:

If ductwork will vent straight up to the ceiling:

Use a level to draw a line straight up, from the centerline on the template to the ceiling.

Measure 5-1/2from the back wall to the centerline of an 8-1/2hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness to the 5-1/2dimension.

Wall Ducting:

If ductwork will vent to the rear:

Use a level to draw a line straight up from the centerline on the template.

Measure at least 27-3/4above the pencil line

that indicates the bottom installation height, to the centerline of an 8-1/2dia. duct hole. (Hole may be elongated for duct elbow.)

HOUSE WIRING LOCATION:

The junction box is located on the top left side of the hood.

Wiring should enter the back wall at least 18above the bottom of the hood, and within 5-1/2of the left side of the centerline.

1INSTALL FRAMING FOR HOOD SUPPORT

IMPORTANTFraming must be capable of supporting 100 lbs.

8-1/2” min. opening for ductwork

View from rear

cleats

1” x 6” min.

mounting

support

Centerline of

installation

space

If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template.

Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template.

Install a horizontal support at least 1x 6between two wall studs at the mounting screw location. The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs.

IMPORTANT: Reinstall drywall for an even mounting surface.

9

Image 9
Contents Instrucciones de instalación Instructions d’installationRead and Save These Instructions Before YOU Begin Completion Time 1 to 3 HoursRead these instructions completely and carefully Installation Options ContentsPower Supply Accessory Duct CoverAdvance Planning Duct Fittings Flexible ductingDo not use flexible plastic ducting Tools and Materials Required not Supplied Remove the PackagingAccessories Determine Installation HeightWall Mount ZV830 Installation Heights PossibleLocate and count Screws Duct cover Check Installation Hardware28-7/8 ″ 10-7/8 ″DUCTWORK, Wiring Locations INSTALLATION-VENTED to the OutsideInstall Framing for Hood Support House Wiring LocationInstall Duct Bracket Install Hood Mounting ScrewsMount the Hood Secure the bracket to the wallConnect Ductwork Install Duct Covers Verify that power is turned off at the sourceConnect Electrical Finalize Installation Install FiltersINSTALLATION-RECIRCULATING Tape the template in position along the penciled lineImportant Framing must be capable of supporting 100 lbs Check to be sure the mounting screws are horizontally level Size and CUT Duct Piece Outlet Hold the assembly against Duct bracketRemove protective plastic Secure the junction box cover with the 6 original screwsCovering Place the decorative duct Covers on top of the hoodRemove all tape and packing material Installation Instructions Installation Instructions Avertissement Lisez ET Conservez CES Instructions Avant DE CommencerAvertissement Pour Réduire Avertissement Afin DE RéduireOptions D’INSTALLATION Dimensions ET IntervallesTable DES Matières 28 cm 10-7/8 poAccessoire Cache Conduit PlanificationAlimentation ’utilisez PAS de conduit en plastique flexible Raccords DE CanalisationRetirer L’EMBALLAGE Outils ET Matériaux NécessairesNON Fournis Serre-filsAccessoires Définition DE LA Hauteur ’INSTALLATIONSupport mural ZV830 Hauteurs d’installation HauteurRepérez et comptez les vis Vérification DU Matériel D’INSTALLATIONEmplacement DES Câbles DE LA Maison INSTALLATION-VENTILÉ Vers L’EXTÉRIEURConduit de plafond Conduit muralInstallez Les vis Trou de ligne médiane Installer LE Support DE CanalisationMonter LA Hotte Fixez le support sur le murFlux d’air Connecter LA CanalisationCache de Boîte à bornes Vérifiez que l’alimentation est coupée à la sourceSupport de cache Conduit Trous de visTerminer L’INSTALLATION Installer LES FiltresINSTALLATION- Recyclage Monter LA Hotte Les sorties de la hotte Mesurer ET Couper LE ConduitLongueur Conduit Du déflecteurCache Connecter LES Parties ÉlectriquesSupérieur Cache conduit Inférieur Vérifiez que l’alimentation est coupée à la sourceInstaller LES Filtres Instructions d’installation Instructions d’installation Instructions d’installation Precaución Guarde Estas Instrucciones Antes DE EmpezarAdvertencia Tiempo para la instalación 1 a 3 horasOpciones DE Instalación Contenidos10-7/8 Altura Hasta el 24 Mín 30 Máx 18-7/8 29-7/8Fuente DE Energía Planificación PreviaAccesorio DE Cubierta DE Conducto Instrucciones de conexión a tierraAccesorios Para Conductos Del ducto Dimensiones Equivalente Utilizada TotalLongitud Pieza Longitud CantidadHerramientas Y Materiales Requeridos Quite EL EnvoltorioNo Incluido Accesorios Establezca LA Altura DE InstalaciónAlturas de instalación De montaje de pared de ZV830 Altura deControle LOS Elementos Para LA Instalación Ubicación DE LOS Conductos Y Cableado INSTALACIÓN-VENTILACIÓN Hacia EL ExteriorInstale EL Armazón Para EL Soporte DE LA Campana Ubicación DE Cableado DomésticoInstale LOS Tornillos DE Montaje DE LA Campana Instale LA CampanaQuite la plantilla Instale EL Soporte DEL ConductoConecte EL Conducto Instale LAS Cubiertas DE LOS Conductos Instale LOS Filtros Finalice LA InstalaciónOrificios para Tornillos Ubicación del INSTALACIÓN-RECIRCULACIÓNCableado Doméstico El cielorrasoPencil Line Indicating De medida LongitudQuite la tapa protectora de Plástico Orificios de ventilación serán visibles en esta instalaciónCubierta de conducto i nferior Instale LOS Filtros Notas Notas Para servicio técnico local Monogram en su área, llame al GE Consumer & Industrial
Related manuals
Manual 40 pages 46.91 Kb

ZV830 specifications

The GE ZV830 is a groundbreaking and sophisticated addition to the lineup of kitchen appliances, designed to elevate both functionality and aesthetics. Packed with a range of advanced features, the ZV830 stands out as a state-of-the-art microwave that not only meets but exceeds modern culinary demands.

One of the standout characteristics of the GE ZV830 is its sleek and modern design, which seamlessly integrates into any kitchen decor. The appliance features a stainless-steel finish that is not only visually appealing but also easy to clean, making it a practical choice for busy homeowners. The unit is designed for installation over a range or cooktop, freeing up counter space while providing powerful cooking capabilities.

The ZV830 is equipped with a robust 1.7 cubic feet capacity, providing ample space for cooking large dishes or multiple items simultaneously. This microwave offers an impressive 1,000 watts of cooking power, ensuring quick and efficient heating, defrosting, and cooking of food.

One of the key technologies implemented in the GE ZV830 is its sensor cooking feature. This advanced technology allows the microwave to automatically adjust cooking times and power levels based on the moisture released from the food. As a result, users can achieve perfectly cooked meals without the guesswork traditionally associated with microwave cooking.

Additionally, the GE ZV830 boasts a range of convenient cooking presets and auto-reheat options, streamlining meal preparation. Features such as popcorn settings and pizza reheating options make it a versatile tool for any kitchen. The unit also includes a dedicated steam function, which is perfect for health-conscious individuals looking to prepare steamed vegetables easily.

Highly regarded for its user-friendly interface, the GE ZV830 includes a large LED display that provides clear visibility of cooking settings and times. The straightforward keypad allows for easy input, making it accessible for all users, including those less familiar with kitchen technology.

Furthermore, the GE ZV830 is designed with safety in mind. It includes child lock features to prevent unintended use, offering peace of mind for families. In conclusion, the GE ZV830 is an exemplary microwave that combines design, performance, and innovative technology to enhance the cooking experience. Its advanced features and user-centric design make it a valuable addition to any modern kitchen.