Cleveland Range Gas 20.20 manual Table of Contents

Page 2

Installation

Operating Instructions

Cleaning Instructions

Service Parts

Maintenance

Table of Contents

For the Installer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Installation Instructions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5 Instructions for Casters. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Specification Sheets -

OGB-20.20 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8

OGS-20.20 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-10

Control Panel, Quick Start . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Control Panel, Detail View . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-13

Cleaning the Oven Chamber . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-16

Semi- Automatic Cleaning of Oven Chamber . . . . . . . . . . . . . . . . . . . 17-18

CONVOClean Automatic Cleaning System (optional) . . . . . . . . . . . . 19-20

Descale Steam Generator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21-23

General Assembly Drawings -

 

20.20 Gas Generator with Cleaning

24-25

20.20 Gas Injection with Cleaning

26-27

Component Panel, Gas (OGB 20.20)

28-29

Control Panel, with Picto (all models)

. . . 30

Outer Base (OGB 20.20)

. . . 31

Water Hose System, Condenser (all models)

. . . 32

Water Valve (all models)

. . . 33

Water Valve (OGB 20.20)

. . . 34

Water Valve (OGS 20.20)

. . . 35

Burner Insert, HL, Pre-mounted (all Gas models)

. . . 36

Burner Insert, Air, LP & Natural Gas (all Gas models)

. . . 37

Pump, Steam Generator, Gas, 110V (all Gas models)

. . . 38

Door (20.20 models)

. . . 39

Sliding Plate (all models)

40-41

Exterior Sheeting (all models)

. . . 42

OGB 20.20 -

 

Sequence of Operations

43-49

Wiring Diagrams

50-56

Ladder Diagrams

57-58

OGS 20.20 -

Sequence of Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59-64

Wiring Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 65-70

Ladder Diagrams. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71-73

Image 2
Contents Service & Parts Manual Table of Contents For the Installer Cleveland Statement of Policies General Information about Combis Installation Instructions Installation of the Combi General Instructions Page Cleveland Range, LLC Advanced Closed System offers the following advantages GAS Fired Boilerless Total Connected Load 265,500 BTU 239,000 BTU Propane Hot Air Control Panel Basic Operation Control Panel Detail View Function Indicators AT the END of the DAY or Shift Avoid scratching the oven chamber or engaging frame Page Semi-Automatic Cleaning of the Oven Chamber Page CONVOClean Automatic Cleaning System optional Page Descale Steam Generator General Safety for Descaling Page GAS Generator W Cleaning QTY Part N0 Description GAS INJ W Cleaning FAN, AIR Inlet BOX Assembly GAS Component Panel ASSEMBLY, GAS OGB 20.20 ModelsASSEMBLY, Control PANEL, with Picto ALL ModelsASSEMBLY, Outer Base Item QTY Part N0. DescriptionPage ASSEMBLY, Water Hose SYSTEM, Condenser ASSEMBLY, Water Valve ALL 20.20 ModelsValve Assy WAY 120VAC OGS 20.20 Models Burner INSERT, HL, PRE-MOUNTED ALL GAS ModelsBur C26 Bur C26 ASSEMBLY, Burner INSERT, AIR, LP & NAT GAS Burner INSERT, HL, PRE-MOUNTED, 6.10/6.20Com Bu Com Bu PUMP, Steam GENERATOR, GAS Door Complete ModelsSliding PLATE, Complete ALL 6.20, 10.10 Models & 20.20 ModelsDetail B Exterior Sheeting Cleveland Range OGB Sequence of Operations Page Page Page Page Page Page Cleveland RANGE, LLC Wiring Diagram A12 A10 A20 N20 U20 345678 N22 Ladder Diagram Page GAS Board Cleveland Range OGS Sequence of Operations Page Page Page Page Page OGS X13.6 U10.1 S3WIRING Diagram X28 4567 X1021 Sheet 6 HOT Lower Agas Valve Wiring Diagram Wattage