Cleveland Range Gas 20.20 manual

Page 52

(b)24 VAC is sent from terminal 2 of connector X2 on the Steam Burner Control Module (N21) to the hot surface igniter (R20).

(c)The gas valve is energized allowing gas and air into the burner chamber to be ignited by the hot surface igniter.

(d)The Steam Burner Control Module (N21) senses between 0.5 and 4.0 micro-amps DC from the flame sensor (P1) at terminal 3 of connector X2 (within 4 seconds) and sends a signal from terminal 2 of connector X1 to terminal 11 of connector X25 on the Gas Board (A20)

The steam generator heat circuit continues until 190 degrees F is detected from the Steam Generator probe (B4) at terminals 1 and 2 of connector X17 on the Control Board (A10)

4With the combi in the steam mode with time on the timer, the door closed and the start switch is depressed

a The front display will include a lighted bar under the steam symbol

When the heat circuit is energized the heat symbol will be energized

The cooking mode symbol will be energized.

The time display will invert and begin to count down.

bThe fan circuit is energized by the Control Board (A10) transmitting and receiving a signal from terminals 5,6,7 and 8 on connector X10 to terminals 3,4,5 and 6 of connector X28 on the Gas Board (A20)

The Gas board (A20) Transmits a signal from terminal 3 of connector X26 to terminal 3 of connector X12 the Upper Motor Drive (U10.1)

240 VAC 3 phase is sent from the Motor board to the Oven Fan motor (M1)

Every 120 seconds the rotation of the motor reverses.

NOTE: If the temperature is less than 212 degrees F than fan will be pulsed on for 2 seconds every 60 seconds after the cabinet set temp (B6) and the bypass probe (B5) are satisfied.

The Gas board (A20) Transmits a signal from terminal 7 of connector X26 to terminal 3 of connector X12 the Lower Motor Drive (U10.1)

240 VAC 3 phase is sent from the Motor board to the Oven Fan motor (M1)

Every 120 seconds the rotation of the motor reverses.

NOTE: If the temperature is less than 212 degrees F than fan will be pulsed on for 2 seconds every 60 seconds after the cabinet set temp (B6) and the bypass probe (B5) are satisfied.

cThe steam generator heat circuit is energized after the signal is received from the motor board that the blower motor is turning

A signal is sent from terminal 8 of connector X24 on the Gas Board (A20) to terminal 4 of connector X2 on the Steam Power Burner and Fan Control (U21) selecting the set speed of the combustion blower.

When this speed is attained the signal is sent from terminal 2 of connector X2 on the Steam Power Burner and Fan Control (U21) to terminal 9 of connector X24 on the Gas Board (A20)

Image 52
Contents Service & Parts Manual Table of Contents For the Installer Cleveland Statement of Policies General Information about Combis Installation Instructions Installation of the Combi General Instructions Page Cleveland Range, LLC Advanced Closed System offers the following advantages GAS Fired Boilerless Total Connected Load 265,500 BTU 239,000 BTU Propane Hot Air Control Panel Basic Operation Control Panel Detail View Function Indicators AT the END of the DAY or Shift Avoid scratching the oven chamber or engaging frame Page Semi-Automatic Cleaning of the Oven Chamber Page CONVOClean Automatic Cleaning System optional Page Descale Steam Generator General Safety for Descaling Page GAS Generator W Cleaning QTY Part N0 Description GAS INJ W Cleaning FAN, AIR Inlet BOX Assembly GAS Component Panel ASSEMBLY, GAS OGB 20.20 ModelsASSEMBLY, Control PANEL, with Picto ALL ModelsASSEMBLY, Outer Base Item QTY Part N0. DescriptionPage ASSEMBLY, Water Hose SYSTEM, Condenser ASSEMBLY, Water Valve ALL 20.20 ModelsValve Assy WAY 120VAC OGS 20.20 Models Burner INSERT, HL, PRE-MOUNTED ALL GAS ModelsBur C26 Bur C26 ASSEMBLY, Burner INSERT, AIR, LP & NAT GAS Burner INSERT, HL, PRE-MOUNTED, 6.10/6.20Com Bu Com Bu PUMP, Steam GENERATOR, GAS Door Complete ModelsSliding PLATE, Complete ALL 6.20, 10.10 Models & 20.20 ModelsDetail B Exterior Sheeting Cleveland Range OGB Sequence of Operations Page Page Page Page Page Page Cleveland RANGE, LLC Wiring Diagram A12 A10 A20 N20 U20 345678 N22 Ladder Diagram Page GAS Board Cleveland Range OGS Sequence of Operations Page Page Page Page Page OGS X13.6 U10.1 S3WIRING Diagram X28 4567 X1021 Sheet 6 HOT Lower Agas Valve Wiring Diagram Wattage