Cleveland Range Gas 20.20 manual

Page 51

If the condensate box is heated to 140 degrees F at the B3probe, 120 VAC is sent from terminal 5 of connector X12 to the condenser valve (Y1) until the temperature drops.

bThe display will show the set temperature and set time when the flush is done or a negative reply is made to the “Generator Flush?”.

cThe Control Board (A10) will check the water level by looking for a ground at terminals 1 and 2 on connector X15. These are connected to the high and low probes (B1) in the steam generator.

If the ground is not found 120 VAC is sent from terminal 7 on connector X12 on the Control Board (A10) to the fill solenoid (Y3)

The fill solenoid opens and the generator is filled until both probes are grounded.

If the top probe becomes ungrounded for more that 5 seconds the fill solenoid (Y3) will energize.

If the bottom probe becomes ungrounded the combi will fill immediately and the combi will not heat

dWhen terminal 2 on connector X15 is grounded, the Control Board (A10) sends 120 VAC to

The primary of the Hot Air 24v Transformer (T1)

24 VAC is sent from the secondary of the transformer to the Hot air Burner Control (N20)

The primary of the Steam 24v Transformer (T2)

24 VAC is sent from the secondary of the transformer to the Steam Burner Control (N21)

Terminal 1 on connector X20 of the Gas Control Board (A20)

Terminal 12 on connector X1 of the Upper Hot Air Control Module (N20)

Terminal 12 on connector X1 of the Steam Control Module (N22)

Terminal 12 on connector X1 of the Lower Hot Air Control Module (N22)

eIf the Steam Generator temperature is less than 190 dgrees the Control board transmits and receives a signal from terminals 5,6,7 and 8 on connector X10 to terminals 3,4,5 and 6 of connector X28 on the Gas Board (A20)

The Gas Board (A20) begins the steam generator heat circuit

A signal is sent from terminal 8 of connector X24 to terminal 4 of connector X2 on the Steam Power Burner and Fan Control (U21) selecting the set speed of the combustion blower.

(a)When this speed is attained the signal is sent from terminal 2 of connector X2 on the Steam Power Burner and Fan Control (U21) to terminal 9 of connector X24 on the Gas Board (A20)

A request for heat is sent from terminal 3 of connector X21 on the Gas Board (A20) to terminal 10 on connector X1 on the Steam Burner Control Module (N21)

(a)120 VAC is sent from terminal 8 of connector X1 of the Steam Burner Control Module through the high limit (B7.2) to terminal 7 of connector X1 of the Steam Burner Control Module

Image 51
Contents Service & Parts Manual Table of Contents For the Installer Cleveland Statement of Policies General Information about Combis Installation Instructions Installation of the Combi General Instructions Page Cleveland Range, LLC Advanced Closed System offers the following advantages GAS Fired Boilerless Total Connected Load 265,500 BTU 239,000 BTU Propane Hot Air Control Panel Basic Operation Control Panel Detail View Function Indicators AT the END of the DAY or Shift Avoid scratching the oven chamber or engaging frame Page Semi-Automatic Cleaning of the Oven Chamber Page CONVOClean Automatic Cleaning System optional Page Descale Steam Generator General Safety for Descaling Page GAS Generator W Cleaning QTY Part N0 Description GAS INJ W Cleaning FAN, AIR Inlet BOX Assembly GAS OGB 20.20 Models Component Panel ASSEMBLY, GASALL Models ASSEMBLY, Control PANEL, with PictoItem QTY Part N0. Description ASSEMBLY, Outer BasePage ASSEMBLY, Water Hose SYSTEM, Condenser ALL 20.20 Models ASSEMBLY, Water ValveValve Assy WAY 120VAC OGS 20.20 Models ALL GAS Models Burner INSERT, HL, PRE-MOUNTEDBur C26 Bur C26 Burner INSERT, HL, PRE-MOUNTED, 6.10/6.20 ASSEMBLY, Burner INSERT, AIR, LP & NAT GASCom Bu Com Bu PUMP, Steam GENERATOR, GAS Models Door CompleteALL 6.20, 10.10 Models & 20.20 Models Sliding PLATE, Complete Detail B Exterior Sheeting Cleveland Range OGB Sequence of Operations Page Page Page Page Page Page Cleveland RANGE, LLC Wiring Diagram A12 A10 A20 N20 U20 345678 N22 Ladder Diagram Page GAS Board Cleveland Range OGS Sequence of Operations Page Page Page Page Page OGS X13.6 U10.1 S3WIRING Diagram X28 4567 X1021 Sheet 6 HOT Lower Agas Valve Wiring Diagram Wattage