Cleveland Range Gas 20.20 manual

Page 54

Every 120 seconds the rotation of the motor reverses.

NOTE: If the temperature is less than 212 degrees F than fan will be pulsed on for 2 seconds every 60 seconds after the cabinet set temp (B6) and the bypass probe (B5) are satisfied.

cHot air heat circuit is energized

A signal is sent from terminal 2 of connector X24 on the Gas Board (A20) to terminal 4 of connector X2 on the Upper Hot Air Power Burner and Fan Control (U20) selecting the set speed of the combustion blower.

When this speed is attained the signal is sent from terminal 2 of connector X2 on the Upper Hot Air Power Burner and Fan Control (U20) to terminal 3 of connector X24 on the Gas Board (A20)

A request for heat is sent from terminal 3 of connector X20 on the Gas Board (A20) to terminal 10 on connector X1 on the Upper Hot Air Control Module (N20)

24 VAC is sent from terminal 2 of connector X2 on the Upper Hot Air Control Module (N20) to the hot surface igniter (R20).

The gas valve is energized allowing gas and air into the burner chamber to be ignited by the hot surface igniter.

The Upper Hot Air Burner Control Module (N20) senses at least 1.5 micro amps DC from the Flame sensor (P1) at terminal 3 of connector X2 and sends a signal from terminal 2 of connector X1 to terminal 10 of connector X25 on the Gas Board (A20)

dWhen the Upper Burner Assembly has proven flame, the Lower Hot Air heat circuit is energized

A signal is sent from terminal 8 of connector X24 on the Gas Board (A20) to terminal 4 of connector X2 on the Lower Hot Air Power Burner and Fan Control (U21) selecting the set speed of the combustion blower.

When this speed is attained the signal is sent from terminal 2 of connector X2 on the Hot Air Power Burner and Fan Control (U21) to terminal 8 of connector X24 on the Gas Board (A20)

A request for heat is sent from terminal 3 of connector X22 on the Gas Board (A20) to terminal 10 on connector X1 on the Hot Air Control Module (N22)

24 VAC is sent from terminal 2 of connector X2 on the Hot Air Control Module (N20) to the hot surface igniter (R20).

The gas valve is energized allowing gas and air into the burner chamber to be ignited by the hot surface igniter.

The Hot Air Burner Control Module (N20) senses at least 1.5 micro amps DC from the Flame sensor (P1) at terminal 3 of connector X2 and sends a signal from terminal 2 of connector X1 to terminal 10 of connector X25 on the Gas Board (A20)

eThe heat circuit will remain energized until the cabinet set temperature is reached

fWhen the condensate box is heated to 140 degrees F at the B3 probe, 120 VAC is sent from terminal 5 of connector X12 to the condenser valve (Y1) until the temperature drops.

gIf the “Crisp and Tasty” mode is selected

Image 54
Contents Service & Parts Manual Table of Contents For the Installer Cleveland Statement of Policies General Information about Combis Installation Instructions Installation of the Combi General Instructions Page Cleveland Range, LLC Advanced Closed System offers the following advantages GAS Fired Boilerless Total Connected Load 265,500 BTU 239,000 BTU Propane Hot Air Control Panel Basic Operation Control Panel Detail View Function Indicators AT the END of the DAY or Shift Avoid scratching the oven chamber or engaging frame Page Semi-Automatic Cleaning of the Oven Chamber Page CONVOClean Automatic Cleaning System optional Page Descale Steam Generator General Safety for Descaling Page GAS Generator W Cleaning QTY Part N0 Description GAS INJ W Cleaning FAN, AIR Inlet BOX Assembly GAS Component Panel ASSEMBLY, GAS OGB 20.20 ModelsASSEMBLY, Control PANEL, with Picto ALL ModelsASSEMBLY, Outer Base Item QTY Part N0. DescriptionPage ASSEMBLY, Water Hose SYSTEM, Condenser ASSEMBLY, Water Valve ALL 20.20 ModelsValve Assy WAY 120VAC OGS 20.20 Models Burner INSERT, HL, PRE-MOUNTED ALL GAS ModelsBur C26 Bur C26 ASSEMBLY, Burner INSERT, AIR, LP & NAT GAS Burner INSERT, HL, PRE-MOUNTED, 6.10/6.20Com Bu Com Bu PUMP, Steam GENERATOR, GAS Door Complete ModelsSliding PLATE, Complete ALL 6.20, 10.10 Models & 20.20 ModelsDetail B Exterior Sheeting Cleveland Range OGB Sequence of Operations Page Page Page Page Page Page Cleveland RANGE, LLC Wiring Diagram A12 A10 A20 N20 U20 345678 N22 Ladder Diagram Page GAS Board Cleveland Range OGS Sequence of Operations Page Page Page Page Page OGS X13.6 U10.1 S3WIRING Diagram X28 4567 X1021 Sheet 6 HOT Lower Agas Valve Wiring Diagram Wattage