Cleveland Range Gas 20.20 manual

Page 70

In the full mode (3 drops in the display) the Y2 valve will be energized continuously.

f When the timer counts to 0 or the core temp probe (B10) reaches the set amount the cycle .

6With the combi in the Combi mode with time on the timer, the door closed and the start switch is depressed

a The front display will include a lighted bar under the Combi symbol

When the heat circuit is energized the heat symbol will be energized

The cooking mode symbol will be energized.

The time display will invert and begin to count down.

bThe fan circuit is energized by the Control Board (A10) transmitting and receiving a signal from terminals 5,6, and 7 on connector X10 to connector X12 on the Motor Drive Board (U10).

The motor Drive Board sends a signal through the thermal switch in the motor from Terminal 5 and receives on terminal 6

If the thermal switch is not open the Motor Drive Board (U10) sends 240 VAC 3 phase to the motor.

The motor reverses direction every 120 seconds with a 15 second coast.

cHot air heat circuit is energized

A signal is sent from terminal 8 of connector X15 on the Control Board (A10) to terminal 4 of connector X2 on the Hot Air Power Burner and Fan Control (U20) selecting the set speed of the combustion blower.

When this speed is attained the signal is sent from terminal 2 of connector X2 on the Hot Air Power Burner and Fan Control (U20) to terminal 2 of connector X15 on the Control Board (A10)

A request for heat is sent from terminal 3 of connector X12 on the Control Board (A10) to terminal 10 on connector X1 on the Hot Air Control Module (N20)

24 VAC is sent from terminal 2 of connector X2 on the Hot Air Control Module (N20) to the hot surface igniter (R20).

The gas valve is energized allowing gas and air into the burner chamber to be ignited by the hot surface igniter.

The Hot Air Burner Control Module (N20) senses at least 1.5 micro amps DC from the flame sensor (P1) at terminal 3 of connector X2 and sends a signal from terminal 2 of connector X1 to terminal 12 of connector X15 on the Control Board (A10)

The heat circuit will remain energized until the cabinet set temperature is reached as sensed at probe B6.

dThe steam circuit is energized.

120 VAC is sent from terminal 4 of connector X12 on the Control Board (A10) to the coil of the Y3 solenoid allowing water to be thrown against the element until the bypass probe (B5) senses 183 degrees F.

The heat circuit will remain energized until the cabinet set temperature is reached

Image 70
Contents Service & Parts Manual Table of Contents For the Installer Cleveland Statement of Policies General Information about Combis Installation Instructions Installation of the Combi General Instructions Page Cleveland Range, LLC Advanced Closed System offers the following advantages GAS Fired Boilerless Total Connected Load 265,500 BTU 239,000 BTU Propane Hot Air Control Panel Basic Operation Control Panel Detail View Function Indicators AT the END of the DAY or Shift Avoid scratching the oven chamber or engaging frame Page Semi-Automatic Cleaning of the Oven Chamber Page CONVOClean Automatic Cleaning System optional Page Descale Steam Generator General Safety for Descaling Page GAS Generator W Cleaning QTY Part N0 Description GAS INJ W Cleaning FAN, AIR Inlet BOX Assembly GAS Component Panel ASSEMBLY, GAS OGB 20.20 ModelsASSEMBLY, Control PANEL, with Picto ALL ModelsASSEMBLY, Outer Base Item QTY Part N0. DescriptionPage ASSEMBLY, Water Hose SYSTEM, Condenser ASSEMBLY, Water Valve ALL 20.20 ModelsValve Assy WAY 120VAC OGS 20.20 Models Burner INSERT, HL, PRE-MOUNTED ALL GAS ModelsBur C26 Bur C26 ASSEMBLY, Burner INSERT, AIR, LP & NAT GAS Burner INSERT, HL, PRE-MOUNTED, 6.10/6.20Com Bu Com Bu PUMP, Steam GENERATOR, GAS Door Complete ModelsSliding PLATE, Complete ALL 6.20, 10.10 Models & 20.20 ModelsDetail B Exterior Sheeting Cleveland Range OGB Sequence of Operations Page Page Page Page Page Page Cleveland RANGE, LLC Wiring Diagram A12 A10 A20 N20 U20 345678 N22 Ladder Diagram Page GAS Board Cleveland Range OGS Sequence of Operations Page Page Page Page Page OGS X13.6 U10.1 S3WIRING Diagram X28 4567 X1021 Sheet 6 HOT Lower Agas Valve Wiring Diagram Wattage