Cleveland Range Gas 20.20 manual Cleveland Range OGB Sequence of Operations

Page 50

CLEVELAND RANGE OGB 20.20

SEQUENCE OF OPERATIONS

When using these instructions refer to the OGB 6.20 wiring schematic.

1When 120 VAC is applied to the combi, it is sent to the Power Control Switch (S1).

2When the Power Control Switch (S1) is closed a The red light in the switch is energized.

b 120 VAC is sent through the line filter (Z1) then through the 20 amp fuse (F10.1) to terminal L1 on the Motor Drive (U10.1)

c 120 VAC is sent through the line filter (Z2) then through the 20 amp fuse (F10.2) to terminal L1 on the Motor Drive (U10.2)

d 120vac is sent through the 2 amp fuse (F1.1) to

To terminals 1 and 2 of connector X1 on the Upper Hot Air Power Burner Control (U20)

To terminals 1 and 2 of connector X1 on the Steam Power Burner Control (U21)

To terminals 1 and 2 of connector X1 on the Lower Hot Air Power Burner Control (U22)

The 12 VDC Power Supply (G1)

12 VDC is sent to terminals 1 and 2 of connector X28 on the Gas Board (A20)

12 VDC is sent to terminal 3 and 4 of connector X10 on the Control Board (A10)

To terminal 1 of connector X12 on the Control Board (A10)

eWith 12 VAC to the Control Board (A10) The Operation Board (A11) is energized

An alarm will sound for one second

All the LED’s and the display will energize one at a time.

“STARTING” will be displayed for 3 seconds

“Please wait” will be displayed

The international model number will be displayed

The time and date will be displayed and this will continue until the on/off switch is depressed.

3When the ON/OFF is depressed with the combi in the steam mode

a After a date change (the first time the combi is turned on) the display will ask “Generator Flush?”. If no answer is given in 10 seconds or a yes is indicated the flush will begin.

120 VAC is sent from terminal 1 of connector X13 on the Control Board (A10) to the Generator Pump (M4).

As the water level drops below the probes the fill solenoid (Y3) will energize. This rocking of the water will help flush scale from the generator.

Image 50
Contents Service & Parts Manual Table of Contents For the Installer Cleveland Statement of Policies General Information about Combis Installation Instructions Installation of the Combi General Instructions Page Cleveland Range, LLC Advanced Closed System offers the following advantages GAS Fired Boilerless Total Connected Load 265,500 BTU 239,000 BTU Propane Hot Air Control Panel Basic Operation Control Panel Detail View Function Indicators AT the END of the DAY or Shift Avoid scratching the oven chamber or engaging frame Page Semi-Automatic Cleaning of the Oven Chamber Page CONVOClean Automatic Cleaning System optional Page Descale Steam Generator General Safety for Descaling Page GAS Generator W Cleaning QTY Part N0 Description GAS INJ W Cleaning FAN, AIR Inlet BOX Assembly GAS Component Panel ASSEMBLY, GAS OGB 20.20 ModelsASSEMBLY, Control PANEL, with Picto ALL ModelsASSEMBLY, Outer Base Item QTY Part N0. DescriptionPage ASSEMBLY, Water Hose SYSTEM, Condenser ASSEMBLY, Water Valve ALL 20.20 ModelsValve Assy WAY 120VAC OGS 20.20 Models Burner INSERT, HL, PRE-MOUNTED ALL GAS ModelsBur C26 Bur C26 ASSEMBLY, Burner INSERT, AIR, LP & NAT GAS Burner INSERT, HL, PRE-MOUNTED, 6.10/6.20Com Bu Com Bu PUMP, Steam GENERATOR, GAS Door Complete ModelsSliding PLATE, Complete ALL 6.20, 10.10 Models & 20.20 ModelsDetail B Exterior Sheeting Cleveland Range OGB Sequence of Operations Page Page Page Page Page Page Cleveland RANGE, LLC Wiring Diagram A12 A10 A20 N20 U20 345678 N22 Ladder Diagram Page GAS Board Cleveland Range OGS Sequence of Operations Page Page Page Page Page OGS X13.6 U10.1 S3WIRING Diagram X28 4567 X1021 Sheet 6 HOT Lower Agas Valve Wiring Diagram Wattage