Cleveland Range KET-3-T manual Installation, General, Inspection, Shipping Damage Instructions

Page 3

INSTALLATION

GENERAL

Installation of the kettle must be accomplished by qualified electrical installation personnel working to all applicable local and national codes. Improper installation of product could cause injury or damage.

This equipment is built to comply with applicable standards for manufacturers. Included among those approval agencies are: UL, NSF, ASME/Ntl. Bd., CSA, CGA, ETL, and others. Many local codes exist, and it is the responsibility of the owner/installer to comply with these codes.

Note: Maximum voltage for LVD (low volt directive for Europe) to be 440 volts for CE marked appliances.

INSPECTION

Before unpacking visually inspect the unit for evidence of damage during shipping.

If damage is noticed, do not unpack the unit, follow Shipping Damage Instructions shown below.

SHIPPING DAMAGE

INSTRUCTIONS

If shipping damage to the unit is discovered or suspected, observe the following guidelines in preparing a shipping damage claim.

1.Write down a description of the damage or the reason for suspecting damage as soon as it is discovered. This will help in filling out the claim forms later.

2.As soon as damage is discovered or suspected, notify the carrier that delivered the shipment.

3.Arrange for the carrier's representative to examine the damage.

4.Fill out all carrier claims forms and have the examining carrier sign and date each form.

INSTALLATION

The first installation step is to refer to the Specification Sheets or Specification Drawings for detailed clearance requirements of the kettle. Next, carefully cut open the shipping carton for easy removal of the kettle.

CLEARANCE REQUIREMENTS

Model #

Back*

Left Side

Right Side

 

 

 

 

KET-3-T

2 1/4”

0

0

KET-6-T

2 3/4”

0

0

KET-12-T

5 1/2”

0

0

KET-20-T

8”

0

0

TKET-3-T

6 5/8”

0

0

TKET-6-T

7 1/8”

0

0

TKET-12-T

9 7/8”

0

0

 

 

 

 

* From back of mounting base.

 

 

 

 

POUR PATH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Kettle Size

Min.

Max.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3 Gallon

2”

12”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6 Gallon

3.5”

18”

 

 

 

 

 

 

 

 

 

 

12 Gallon

4”

24”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20 Gallon

6”

28”

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Max.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

Image 3
Contents Operators Manual Table of Contents Inspection InstallationInstallation GeneralAssembly Wire ConnectionElectrical Installation Checks CleaningWater Item # Description Function Operating InstructionsApproximate Boiling Times Operating the KettleCleaning Instructions Care and CleaningMarine Lock Job Cleaning Agent Comments Recommended Cleaners for Specific SituationsService Parts Faucet AssemblyWarranty Item no Description Kettle Bottom & SideItem no Description QTY Cord & Plug OptionConsole Components & Marine Lock Item no Description QTY Gallon Kettle only Tilting Gearbox AssemblyElectrical Panel Inspection and Maintenance Check List MaintenanceBearing Lubricating Procedure Pressure Relief Valve Periodic Testing Procedure Calibrating ProcedureKettle Venting Instructions Reservoir Fill ProceduresVacuum Leak Test Procedure Repairing Leaks in Steam Jacketed Kettle FittingsMarine Lock Testing Procedure Possible Causes Diagnostic GuidePossible Causes Still exists, replace defective control box Wiring Diagram Gallon Symbol Legend page 1 Symbol Legend page 2