Refer to Figure 42. Use tape measure to set rim of subreflector to required distance of 119.110 in (302.6 cm) measured from the top of first seam hardware to the aperture plane of the subreflector using three subreflector adjustment studs.

Attach right angle viewing piece to theodolite. Move subreflector laterally to align the subreflector so it is centered with the theodolite while set at vertical (0° 00’ 00”). A hole is provided at the center of the subreflector to facilitate alignment.

Ensure subreflector is centered and set at required distance. Snug adjustment hardware after centering and height adjustments are complete.

Check distance between subreflector aperture plane and first seam reflector hardware.

Figure 42

45

Installation Procedures

Image 45
Contents Meter ESA Table of Contents Introduction Meter Earth Station AntennaProprietary Data Information and Assistance Technical Customer Service CenterHow to Use This Manual Overview ContentGetting Started OverviewTool Size Quantity Recommended ToolsGetting Started Returning Equipment Step Overview Foundation Preparation Installation Procedures1b A-325 Tensioning For bolts over four diameters Tensioning StepTripod Ground Mount Assembly Azimuth Beam Step Step Support Legs Assembly Step Step 20008A Step Panning Frame Assembly Step X 3 LG mm 200031A Flatwashers Azimuth Pivot Assembly 301786 Azimuth Jack Screw Assembly Step Step Step Elevation Jackscrew Assembly Step Step Grounding Cable Attachment Step Step Installation Procedures Step Jack Tripod Assembly Step Reflector Assembly Step Step Step Step Subreflector Assembly Step Step Theodolite Assembly Installation Step Step Theodolite Leveling Step Step Theodolite Centering Step Theodolite Height Adjustment Reflector Panel Adjustment Step Installation Procedures Subreflector Adjustment Step Offset Operating Angle Top Stud Nut Adjustment Subreflector Offset Tilt Adjustment StepInstallation Procedures Step Operation Overview Acquiring a SatelliteStep Polarization at 45 degrees from Optimum Setting Maximizing Odd Transponders Subreflector Adjustment Preventive Maintenance Overview General Cleaning Electrical PartsPreventive Maintenance Antenna Preventive Maintenance Drive System Voltage Current Checks Step Step Preventive Maintenance Jackscrews/Motors Gear Motor/Housing Fill Drain Requirements Lubrication Chart High-Speed Antenna Lubrication Points Medium-Speed Antenna Lubrication Points Appendix ‘A’ Appendix ‘B’