
Reflector/
Backstructure
Assembly
Feed Rotating
Tube Assembly
Step 1
Type
Refer to Figure 24. Position six temporary supports in center of assembly area 60” apart in a 7 ft (2 m) diameter circle. Place drum assembly on temporary supports as shown with drum tab positioned opposite ground mount assembly.
Note: Supports should be approximately 18 in (457 mm) high and placed between bolt holes on bottom of drum assembly.
Figure 24
29 | Installation Procedures |