Andrew 9.3-Meter ESA manual Polarization at 45 degrees from Optimum Setting

Page 51

Step 7

Step 8

Step 9

Move the antenna in azimuth to obtain a null, then move ± in elevation to obtain a large peak signal. If not, move the antenna in the opposite azimuth direction through the peak and again move ± in elevation to obtain a large peak signal. If a larger peak is not found, you were on the main lobe.

If your antenna is equipped with a linear polarizer, the antenna is aligned in azimuth and elevation (signal maximized) and 24 transponder signals (12 horizontal and 12 vertical) are noted, the polarization adjustment is set incorrectly and must be modified. If 12 transponder signals are noted, they may or may not be the properly polarized signals. Therefore 24 transponder signals must be visually noted in order to determine the prop- er polarization setting.

Rotate the feed assembly clockwise until 24 transponder signals are noted and of approximately equal amplitude.

NOTE: It is more accurate and visually easier to minimize the alternate set of transpon- der signals rather than maximizing the transponder of interest.

Figure 4-3: Polarization at 45 degrees from Optimum Setting

51

Operation

Image 51
Contents Meter ESA Table of Contents Introduction Meter Earth Station AntennaProprietary Data Information and Assistance Technical Customer Service CenterHow to Use This Manual Overview ContentGetting Started OverviewTool Size Quantity Recommended ToolsGetting Started Returning Equipment Step Overview Foundation Preparation Installation Procedures1b A-325 Tensioning For bolts over four diameters Tensioning StepTripod Ground Mount Assembly Azimuth Beam Step Step Support Legs Assembly Step Step 20008A Step Panning Frame Assembly Step X 3 LG mm 200031A Flatwashers Azimuth Pivot Assembly 301786 Azimuth Jack Screw Assembly Step Step Step Elevation Jackscrew Assembly Step Step Grounding Cable Attachment Step Step Installation Procedures Step Jack Tripod Assembly Step Reflector Assembly Step Step Step Step Subreflector Assembly Step Step Theodolite Assembly Installation Step Step Theodolite Leveling Step Step Theodolite Centering Step Theodolite Height Adjustment Reflector Panel Adjustment Step Installation Procedures Subreflector Adjustment Step Offset Operating Angle Top Stud Nut Adjustment Subreflector Offset Tilt Adjustment StepInstallation Procedures Step Operation Overview Acquiring a SatelliteStep Polarization at 45 degrees from Optimum Setting Maximizing Odd Transponders Subreflector Adjustment Preventive Maintenance Overview General Cleaning Electrical PartsPreventive Maintenance Antenna Preventive Maintenance Drive System Voltage Current Checks Step Step Preventive Maintenance Jackscrews/Motors Gear Motor/Housing Fill Drain Requirements Lubrication Chart High-Speed Antenna Lubrication Points Medium-Speed Antenna Lubrication Points Appendix ‘A’ Appendix ‘B’