Andrew 9.3-Meter ESA manual Step

Page 48

Step 3

Step 4

Step 5

Step 6

Step 7

Refer to Figure 46. Extend elevation jack extension assembly to 7 ft (2 m) dimension as shown. Raise assembly and secure to forward ground mount beam assembly, using 6 ft (2 m) choker and winch assembly.

Warning: Do not attempt to raise reflector/backstructure if winds exceed 25 mph. Raise reflector/backstructure assembly and align with corresponding elevation jack/panning frame assemblies using tag lines for guidance.

Note: A minimum of three tag lines should be used during high wind conditions. Do not exert force while using the tag lines during reflector installation as this will distort the panel surfaces.

Figure 46

Connect reflector/backstructure pivot assemblies to panning frame assembly.

Use 7/8 x 2-1/4 in (57 mm) bolts and nuts

Attach tripod pivot assembly to elevation jack assembly.

Use 7/8 x 2-1/2 in (63 mm) bolts, flat washers and nuts

Securely tighten mounting hardware on both sides of pivot assembly according to A-325 Hardware Tensioning Procedure.

Install subreflector subassembly.

Use 3/4 in (19 mm) jam nuts and washers making sure the subreflector is repositioned in the exact location determined at the conclusion of its adjustment.

Secure all hardware.

48

Installation Procedures

Image 48
Contents Meter ESA Table of Contents Meter Earth Station Antenna IntroductionCustomer Service Center Proprietary Data Information and Assistance TechnicalOverview Content How to Use This ManualOverview Getting StartedRecommended Tools Tool Size QuantityGetting Started Returning Equipment Step Installation Procedures Overview Foundation PreparationTensioning Step 1b A-325 Tensioning For bolts over four diametersTripod Ground Mount Assembly Azimuth Beam Step Step Support Legs Assembly Step Step 20008A Step Panning Frame Assembly Step X 3 LG mm 200031A Flatwashers Azimuth Pivot Assembly 301786 Azimuth Jack Screw Assembly Step Step Step Elevation Jackscrew Assembly Step Step Grounding Cable Attachment Step Step Installation Procedures Step Jack Tripod Assembly Step Reflector Assembly Step Step Step Step Subreflector Assembly Step Step Theodolite Assembly Installation Step Step Theodolite Leveling Step Step Theodolite Centering Step Theodolite Height Adjustment Reflector Panel Adjustment Step Installation Procedures Subreflector Adjustment Step Subreflector Offset Tilt Adjustment Step Offset Operating Angle Top Stud Nut AdjustmentInstallation Procedures Step Overview Acquiring a Satellite OperationStep Polarization at 45 degrees from Optimum Setting Maximizing Odd Transponders Subreflector Adjustment Overview General Cleaning Electrical Parts Preventive MaintenancePreventive Maintenance Antenna Preventive Maintenance Drive System Voltage Current Checks Step Step Preventive Maintenance Jackscrews/Motors Gear Motor/Housing Fill Drain Requirements Lubrication Chart High-Speed Antenna Lubrication Points Medium-Speed Antenna Lubrication Points Appendix ‘A’ Appendix ‘B’