Daewoo frs20 manual Take a leakage test on the welded or suspicious area with an

Page 77

Items

Precautions

 

 

4.Refrigerant charging.

4) Refrigerant Charging

 

 

 

Charge refrigerant while operating a compressor as shown above.

 

5) Pinch a charging pipe with a pinch-off plier after completion of charging.

 

6) Braze the end of a pinched charging pipe with copper brazer and take

 

a gas leakage test on the welded parts.

 

 

 

Compressor

Evaporator

 

 

 

 

 

 

Hot Pipe

 

 

Bombe

 

 

 

Condenser

Dryer

 

 

5. Gas-leakage test

* Take a leakage test on the welded or suspicious area with an

electronic leakage tester.

 

 

 

 

 

6. Pipe arrangement

* Check each pipe is placed in its original place before closing

 

in each cycle

a cover back-M/C after completion of work.

 

 

10-4. Standard Regulations for Heavy Repair

1)Observe the safety precautions for gas handling.

2)Use JIG (or wet towel) in order to prevent electric wires from burning during welding. (In order to prevent insulation break and accident.)

3)The inner case shall be melted and insulation material (polyurethane) shall be burnt if not cared during welding inner case parts.

4)The copper pipe shall be oxidized by overheating if not cared during welding.

5)Not allow the aluminum pipes to contact to copper pipes. (In order to prevent corrosion.)

6)Make sure that the inner diameter should not be distorted while cutting a capillary tube.

7)Be sure that a suction pipe and a filling tube should not be substituted each other during welding. ( High efficiency pump.)

76

Image 77
Contents Refrigerator N T E N T S Page External Views FRSN-U20DB / EB FRSN-U20FB / GB Name of Each Parts Freezer Compartment Refrigerator Compartment Freezer Compartment Refrigerator Specification Door Switch , F / R Specification 220~240V Models onlyBasic Model Dispenser Model AC220V / 192WDisplay Operation and FunctionsFront PCB button Dispenser ModelReference Please wait Defrosting Cycle Fan Heater Defrost ModeComp Flow Chart of Defrosting Start Fan Voltage of Control Mode Forced Defrosting ModeSensor FAN, R-FAN, C-FAN VoltageControl of Interior Lights FRSN-U20DA Buzzer or Alarm ControlLouver Heater Control Basic Model DemonstrationMain PCB Resistance of R-sensor Mid ON/OFF Point Compensation of R-sensor ON/OFF PointBasic Model LED Display of Inner Control Error DisplayRT-S Dispenser Model Cled Display of Front PCB Error Code ContentsBasic Model Dispenser Model Eierror Dispenser Model Front PCB Summary of FunctionBasic Model Inner Control Automatic Icemaker Dispenser Model Back up Function Basic ModelStart Ice separating drop mode Dispenser Control Function Lamp Water S/V Circuit Operation Power Circuit DiagramBasic Model Dispenser Model ※ Voltage of every partMicom Function of Each SensorDispenser Model How it works Relay FunctionIC8 Fan Function Wiring Diagram DiagramDispenser Model Circuit Diagram of Main PCB Page Dispenser Model Page Inner View Component Locate WiewFront View Dispenser + Home bar Model Machine Compartment EvaporatorHose Ice Maker Tube Assembly HOW to Check Each PartsDisassembling Procedure How to check Hose Ice Maker Tube AsHow to Check Hose Ice Maker Tube Assembly Bracket Geared Motor AssemblyHow to Check Micro Switch Dispenser Micro Switch▷ Good 215Ω±10% SOL2003-01B 193 ~ 236Ω Dispenser Solenoid Valve88 ~ DC 12V,1.5W ▷Check Change Flap Heater ASCheck Point Remark Main PCBCompensation Used when making R-temp. down ▷ Remove 2 screws on top front of ice maker Ice MakerIce Dropping Motor ▷ Good RS-360RH-14250 ~ 14Ω How to Check Ice MakerBlue Circle On Close※ How to replace Front PCB Faulty Start F/R lights OFF , F-PCB Power OFFTrouble Diagnosis StartDefrost Heater 192W 252 Ω Freezer Compartment4th pipe from buttom Removing and replacing Freezer parts Removing and replacing Freezer parts Defrost Heater Ice Formation on F-Louver Start Switch to pull forward Disconnection / breaking of Freezer Lights Wires StartLight cover Cover and pull forwardRefrigerator Compartment Remove screws of light cover Hold the bottom Cover and pull Disconnection / Breaking of Refrigerator Lights Wires StartChange the light BulbsDoor is open too long ? Sensor is OK ? +screw driver Removing of Check ValveOperation Noise of Refrigerator Page Attach a absorber on point ③ accumulator Troubleshooting of Evaporator SoundFan Noise Start Fan is damaged Or transformed ? Troubleshooting of Fan Noise Pipe Noise Start Door Cooling Cycle Heavy Repair Contents Tools Be sure to replace drier when repairing pipes Precautions During Heavy Repair Use special parts and tools for R-134a or R-600a Drier part with a nipper and then cut low pressure sideRemove residual refrigerant more than 5 minutes later after Practical Work for Heavy RepairClose valve ① To the low pressure sideAn evacuated bombe Be sure to chargeElectronic leakage tester Take a leakage test on the welded or suspicious area with anLow HighBrazing Reference Drawings Compressor Suction PipeInstallation Preparation Installation GuideDimensions including Door Handles Width*Depth*Height 903mm X 734.5mm X 1790mm※Remove front bottom cover first, if it is attached If the refrigerator can not enter the doorReplacing Freezer Door Case freezer door is lower Than refrigerator door Refrigerator Leveling & Door AdjustmentLeave a sufficient distance when cutting the tubes Join connector to water tap Get ready to install water lineAttach the filter box Remove any substance from filterConnect water tube 2Insert the fastening ring into the Water tubeDispenser Water Flow Cabinet Machine Room / Eva Part Refrigerator Room Freezer Room Freezer Door Refrigerator Door Reference