Zephyr AK7536ASX, AK7500ASX, AK7548ASX manual Installation Single and Dual Internal Blowers

Page 13

PBI-1100A DUAL INTERNAL BLOWER WILL ACCOMODATE VERTICAL DUCTING ONLY

Please turn to page 12 for instructions on installing CBI-600B in horizontal ducting mode.

1. Position blower plate over bracket on inside

2. Connect male end of blower wire to female plug

back of hood and pivot up. Secure plate to hood

in the hood. (plug is located inside the hood

with (2) 10x3/16” screws. (blower pictured is a

behind the control panel)

PBI-1100A)

 

3.Single Blower – Connect 6” round duct work to blower collar.

Dual Blower – Place 10” round adapter on top of hood and secure with (4) M4x8 screws.

Connect 10” round duct work to 10” round adapter.

Installation – Single and Dual Internal Blowers

11

Image 13
Contents Use, Care, and Installation Guide Page Installation Table of ContentsTo Reduce the Risk of Range TOP Grease Fire Important Safety NoticeOperation Parts Supplied List of MaterialsDuct pieces Equivalent number Total Length x used Installation Ducting Calculation SheetMounting Height & Clearance InstallationDucting Some Ducting Options Installation Ducting OptionsBack Installation SpecificationsElectrical Installation ElectricalCable Lock This is the top of the board used to hang the hood Mounting the Range HoodInstallation Single and Dual Internal Blowers Installation CBI-600B Horizontal Ducting Conversion Installation CBI-600B Horizontal Ducting Conversion CBE-1000 Wiring Diagram Installation External Blower PreparationBlower On/Off Features & Controls Touch Controls & FeaturesSurface Maintenance Maintenance Cleaning and Filter RemovalStainless Steel Baffle Filters Removing Baffle FiltersReplacing Light Bulbs Maintenance LightsTroubleshooting Procedures for Tempest I and Tempest TroubleshootingIssue Cause What to do Replacement Parts List of Parts and AccessoriesOptional Accessories DescriptionLimited Warranty