Vermont Casting DVBR42, DVBR36 manual General Information Assembling Vent Pipes, Flex Vent Pipes

Page 12

DVBR Series Direct Vent Gas Fireplace

Termination Clearances

Termination clearances for buildings with combustible and noncombustible exteriors.

Inside Corner

Outside Corner

Alcove Applications*

 

 

 

F =

 

 

G =

 

Combustible

G

Combustible

 

6"

(152 mm)

 

6" (152 mm)

V

Noncombustible

 

 

2"

(51 mm)

 

Noncombustible

 

V

 

F

 

2" (51 mm)

 

 

Balcony -

Balcony -

with no side wall

with perpendicular side wall

M

M

 

V

V

 

P

M =

Combustible &

Noncombustible

Combustible &

M = 24" (610 mm)

Noncombustible

P = 20” (508 mm)

12" (305 mm)

D

C C

V

E

O

E = Min. 6” (152 mm) for non-vinyl sidewalls Min. 12” (305 mm) for vinyl sidewalls

O = 8’ (2.4 m) Min.

No.

 

 

of Caps

DMin.

CMax.

1

3’ (.9 mm)

2 x DActual

2

6’ (1.8 m)

1 x DActual

3

9’ (2.7 m)

2/3 x DActual

4

12’ (3.7 m)

1/2 x DActual

DMin. = # of Termination caps x 3

CMax. = (2 / # termination caps) x DActual

584-15

*NOTE: Termination in an alcove space (spaces open only on one side and with an overhang) is permitted with the dimensions specified for vinyl or non-vinyl siding and soffits. 1. There must be a 3’ (914 mm) minimum between termination caps. 2. All mechanical air intakes within 10’ (1 m) of a termination cap must be a minimum of 3’ (914 mm) below the termination cap. 3. All gravity air intakes within 3’ (914 mm) of a termination cap must be a minimum of 1’ (305 mm) below the termination cap.

Fig. 15 Termination clearances.

General Information Assembling Vent Pipes

Canadian Installations

The venting system must be installed in accordance with the current CSA-B149.1 installation code.

USA Installations

The venting system must conform to local codes and/or the current National Fuel Code ANSI Z223.1/NFPA 54.

Only venting components manufactured by CFM Corpo- ration may be used in Direct Vent systems.

Flex Vent Pipes

Before joining the flex vent pipe to the unit, apply a bead of high temperature sealant* (provided) to the 4” pipe exiting the fireplace. Secure flex vent pipe in place with a hose clamp (provided).

*Be sure the flex pipe overlaps at least 1” (25mm) onto the collars of the fireplace and termination. If the ter- mination has an internal bead, be sure to overlap and secure 1” (25 mm) past the bead.

*Be sure the vent is actually crushed before proceed- ing. Apply a tug to be sure the vent will not slip off the collars.

Repeat process with 7” flex vent pipe. The same proce- dure must be performed on the vent side.

Apply High Temperature

Sealant

Hose Clamp

FP1471

Fig. 16 Apply high temperature sealant to 4” and 7” pipes.

12

20000584

Image 12
Contents DVBR42 Table of Contents Installation Instructions Please Read the Following CarefullyFireplace Dimensions Installed as Top Vent Framing DimensionsFireplace Dimensions Installed as Rear Vent Locating Your Fireplace Clearance to CombustiblesMantels ApplianceGas Line Installation HearthFraming and Finishing Final FinishingRemote Switch Installation EB-1 Electrical BoxOptional Top Vent Application DVBR36General Venting Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationCanadian Installations USA InstallationsGeneral Information Assembling Vent Pipes Flex Vent PipesHow to Use the Vent Graph Twist Lock PipesRear Wall Vent Applications Rear Wall Vent Installations Twist Lock Pipe Zero clearance sleeve is only required for combustible wallsRear Wall Vent Installations Flex Vent Pipe Vertical Sidewall ApplicationsTotal angular variation 270 Horizontal run reductionVertical Sidewall Installation Twist Lock Pipe Always install horizontal venting on a level planeVertical Sidewall Installation Flex Vent Pipe StepBelow Grade Installation Vertical Through-the-Roof ApplicationsVertical Through-the-Roof Installation DownwardMin 610 mm Venting Components Glass Cleaning Replacement of Ceramic Hearth PanelsOperating Instructions Glass InformationInstallation of Logs Ember Material Placement Lava RockFlame & Temperature Adjustment Flame CharacteristicsInspecting the Venting System Top logs must be placed properly onto notchesCorrect flame appearance for DVBR36 model Lighting and Operating Instructions To Turn Off Gas To HeaterTroubleshooting Honeywell VS8421 Remove window frame assembly before service workTroubleshooting the Gas Control System Fuel Conversion Instructions Valve Conversion Honeywell ValveNatural Gas Pilot Conversion PSEPilot Conversion SIT Maintenance Cleaning the Standing Pilot Control SystemBurner and Burner Compartment Brass TrimDVBR36/42 DescriptionDVBR36/42 Optional Accessories Remote ControlsOptional Fk-12 Fan Hook-up Ceramic Refractory PanelsDecorative Glass Panels Decorative Frame TrimsDecorative Face Kit Model Beam ColorDvbr Series Direct Vent Gas Fireplace Dvbr Series Direct Vent Gas Fireplace Limited Lifetime Warranty CFM Corporation