Vertical Sidewall Installation

Twist Lock Pipe

Step 1

Locate vent opening on the wall. It may be necessary to first position the fireplace and measure to obtain hole location. Depending on whether the wall is combustible or noncombustible, cut opening to size. (Fig. 31) (For combustible walls first frame in opening.)

NOTE: When using flex vent, the opening will have to be measured according to the 1” (25 mm) rise in 24” (610 mm) vent run.

Combustible Walls: Cut a 9³⁄”H x 9³⁄”W (238mm x 238mm) hole through the exterior wall and frame as shown. (Fig. 31)

Noncombustible Walls: Hole opening must be 7¹⁄

(191 mm) in diameter.

Vent Opening Combustible Wall

9³⁄

(240mm)

9³⁄

(240mm)

Framing Detail

Fireplace Hearth

Vent Opening Non- combustible Wall

7¹⁄” Dia. (190mm)

Fireplace Hearth

VO584-100

Fig. 31 Locate vent opening on wall.

Step 2

Measure wall thickness and cut zero clearance sleeve parts to proper length (MAXIMUM 12” / 305mm). As- semble sleeve and attach to firestop with #8 sheet metal screws (supplied). Install firestop assembly. (Fig. 29)

Zero clearance sleeve is only required for combustible walls.

Step 3

Place fireplace into position. Measure the vertical height

(X)required from the base of the flue collars to the cen- ter of the wall opening. (Fig. 33)

DVBR Series Direct Vent Gas Fireplace

 

Max. Length

 

12” (294 mm)

 

#8 Screws (2)

 

Firestop

#8 Screws (2)

 

#8 Screws

 

(2)

 

Adjustable Zero

 

Clearance Sleeve

CFM135a

Fig. 32 Adjustable zero clearance sleeve.

Step 4

Apply a band of silicone to the inner and outer flue collars of the fireplace and using appropriate length of pipe section(s) attach to fireplace with three (3) screws. Follow with the installation of the inner and outer elbow, again secure joints as described in the “Connecting Vent Pipe” section.

X

X

 

FP1181

Fig. 33

Vertical height requirements.

Step 5

Measure the horizontal length requirement including a 2” (50mm) overlap, i.e. from the elbow to the outside wall face plus 2” (50mm) (or the distance required if installing a second 90° elbow). (Fig. 34)

Always install horizontal venting on a level plane.

Step 6

Use appropriate length of pipe sections - telescopic or fixed - and install. The sections which go through the wall are packaged with the starter kit, and can be cut to suit if necessary.

20000584

17

Image 17
Contents DVBR42 Table of Contents Please Read the Following Carefully Installation InstructionsFraming Dimensions Fireplace Dimensions Installed as Top VentFireplace Dimensions Installed as Rear Vent Clearance to Combustibles Locating Your FireplaceMantels ApplianceHearth Gas Line InstallationFraming and Finishing Final FinishingEB-1 Electrical Box Remote Switch InstallationDVBR36 Optional Top Vent ApplicationLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2USA Installations Canadian InstallationsGeneral Information Assembling Vent Pipes Flex Vent PipesRear Wall Vent Applications How to Use the Vent GraphTwist Lock Pipes Zero clearance sleeve is only required for combustible walls Rear Wall Vent Installations Twist Lock PipeVertical Sidewall Applications Rear Wall Vent Installations Flex Vent PipeHorizontal run reduction Total angular variation 270Always install horizontal venting on a level plane Vertical Sidewall Installation Twist Lock PipeStep Vertical Sidewall Installation Flex Vent PipeVertical Through-the-Roof Applications Below Grade InstallationDownward Vertical Through-the-Roof InstallationMin 610 mm Venting Components Replacement of Ceramic Hearth Panels Glass CleaningOperating Instructions Glass InformationLava Rock Installation of Logs Ember Material PlacementFlame Characteristics Flame & Temperature AdjustmentInspecting the Venting System Top logs must be placed properly onto notchesCorrect flame appearance for DVBR36 model To Turn Off Gas To Heater Lighting and Operating InstructionsRemove window frame assembly before service work Troubleshooting Honeywell VS8421Troubleshooting the Gas Control System Valve Conversion Honeywell Valve Fuel Conversion InstructionsPilot Conversion SIT Natural GasPilot Conversion PSE Cleaning the Standing Pilot Control System MaintenanceBurner and Burner Compartment Brass TrimDescription DVBR36/42DVBR36/42 Remote Controls Optional AccessoriesOptional Fk-12 Fan Hook-up Ceramic Refractory PanelsDecorative Frame Trims Decorative Glass PanelsDecorative Face Kit Model Beam ColorDvbr Series Direct Vent Gas Fireplace Dvbr Series Direct Vent Gas Fireplace Limited Lifetime Warranty CFM Corporation