Vermont Casting DVRSR, DVRSL, DVRS3 installation instructions Below Grade Installations

Page 14

Fig. 24

STEP 7

Support the horizontal pipes every 36 inches (914mm) with metal pipe straps. Make sure that the horizontal vent pipe is installed on a level horizontal plane.

STEP 8

Recheck the fireplace to make sure that it is levelled, properly positioned, and nailed or screwed to the floor.

If applied, the fireplaces adjustable frame drywall strips (nailing flanges) should be fastened. See "Framing & Finishing.

BELOW GRADE INSTALLATIONS

When it is not possible to meet the required vent terminal clearances of 12 inches (305mm) above grade level a model 7DVSKS vent kit is required. It allows installation depth of down to 7 inches (178mm) below grade level. The 7 inches is measured from the centre of the horizontal vent pipe as it penetrates through the wall.

If venting system is installed below ground, we recommend a window well with adequate and proper drainage.

INSTALLATION

Ensure sidewall venting clearances are observed.

The maximum horizontal run with 24" (610mm) vertical rise is 36" (914mm) from the back of the fireplace to the face of the exterior wall. See vent graph (Fig. 18) for extended horizontal run if the vertical exceeds 24" (610mm).

1.Establish vent hole through the wall. See page 12

2.Remove soil to a depth of approximately 16" (406mm) below base of snorkel. Install window well (not supplied). Refill hole with 12" (305mm) of coarse gravel leaving a clearance of approximately 4" (100mm)below snorkel. (Fig. 25)

3.Install vent system. See page 12, Steps 2 through 5.

4.Ensure a watertight seal is made around the vent pipe coming through the wall.

5.Apply high temperature sealant caulking (supplied) around the 4 and 7 inch 7DVSKS's snorkel collars.

6.Slide into vent pipe and secure to the wall.

7.Level the soil so as to maintain a 4" (100mm)clearance below snorkel (Fig. 25).

 

7DVSKS

 

 

(SNORKEL)

 

 

GROUND LEVEL

 

4" (100mm) MIN. CLEARANCE

WINDOW

A MINIMUM OF 24" (610mm)

WELL

 

VERTICAL PIPE MUST BE

 

 

INSTALLED WHEN USING

DRAIN

 

THE 7DVSKS KIT

 

Fig. 25

DO NOT BACK FILL AROUND SNORKEL. SOIL SHOULD NOT BE LESS THAN 4" (100mm) BELOW SNORKEL.

- 14 -

Image 14 Contents
DVRS3 Dvrsl Dvrsr Table of Contents Installation and Operating Instructions Locating Your Majestic GAS FireplaceMantels Fireplace DimensionsMantel Chart Framing and Finishing GAS SpecificationsClearance to Combustibles Final FinishingGAS Line Installation Remote Switch InstallationGeneral Venting Termination Clearances Rear Wall Installations Rear Venting Applications Vertical Sidewall Applications Maximum120 Vertical Sidewall Venting Graph HOW to USE the Vent GraphVertical Sidewall Installation SCREWS2 Below Grade Installations InstallationVertical Through Roof Applications Vertical Thru the Roof Installation DVR Series Crimped Venting Components General Information on Assembling Twist Lock Vent Pipes Vent Opening Combustible Wall Vertical Sidewall Installations Sidewall Venting Graph Vent Sidewall Installation Zero Clearance Sleeve if Required Firestop Two sets of 45 degree elbow offsets within these Vertical Through the Roof Installation DVR Series Twist Lock Venting Components Louvre Removal Front Glass Removal Side Glass RemovalGlass Cleaning Ceramic Refractory InstallationLava Rock Installation of LogsEmber Material Placement Lighting Instructions To Turn OFF GAS to FireplaceTrouble Shooting the GAS Control System SIT 820 Nova Millivolt ValveMaintenance Flame AdjustmentFlame Characteristics Cleaning the Standing Pilot Control SystemReplacement Parts DVRS3 & Dvrsl / Dvrsr Replacement Parts List DVRS3/DVRSL/DVRSR DescriptionFAN KIT FK24 Remote ControlOptions