Enviro EG 33 owner manual FIG-21 FIG-22

Page 13

NOTES:

(1)If an offset is necessary in the attic to avoid obstructions, it is important to support the vent pipe every 3 feet, to avoid excessive stress on the elbows, and possible separation. Wall straps are available for this purpose. FIG-18

(2)When ever possible, use 45° degree elbows instead of 90° degree elbows. The 45° degree elbow offers less restriction to the flow of flue gases and intake air.

NOTES:

(1)For multi story installations. A ceiling firestop (part 963) is required at the second floor, and any subsequent floors. FIG-19. The opening should be framed to 10-inch x 10-inch inside dimensions, in the same manner as shown in FIG- 16.

(2)Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passes through, must be enclosed. The enclosure may be framed and sheetrocked with standard building materials. However consult the appliance manufactures installation instructions for the minimum allowable clearance between the outside of the vent pipe, and the combustible surfaces of the enclosure. Do not fill any required air spaces with insulation.

FIG. 18

FIG. 19

FIG. 20

FIG-21

FIG-22

13

Image 13
Contents What to do if YOU Smell GAS For Your SafetyGeneral Safety PrecautionsCode Approvals Table of ContentsDimensions Deciding Where to Locate Your StoveMobile Home ClearancesFraming Dimensions InstallationIncluding Finished Hearth Height Page Vent Restrictions Required Mantle ClearancesVent Terminal Clearances Flue Collar InstallationVertical Termination Planning Your InstallationVenting Terminals Cannot be Recessed Into a Wall or Siding Horizontal Installation FIG-13 FIG-14 FIG-16 FIG-17 Vertical InstallationFIG-21 FIG-22 Optional Ceramic Panels Installation of Logset and EmbersOperating Instructions For Your Safety Read Before OperatingDo not Clean Glass When HOT Routine Maintenance and TechnicalProblem Possible Cause Solution Trouble ShootingGAS Line Connection Never USE AN Open Flame for Leak TestingOrifice SIZES, Pressures and BTU’S Installing Remote Thermostat or Wall Switch Installing or Removing the BlowerWire Size Maximum Length ElectricalFuel Conversion Remove the two 2 main burner orifices using a ½ deep socketSign and verify that work and information are correct WarrantyMail Address envirofire@home.com Installation Data Sheet