|
|
NOTES: (1) The four wood screws provided should be replaced with the appropriate fasteners for stucco, brick, concrete, or other types of siding.
(2)For buildings with vinyl siding, a vinyl siding standoff (950), should be installed between the vent cap and the exterior wall
NOTES: (1) The horizontal run of vent pipe must be level and should have a 1/4” inch rise for every one foot of run towards the termination. NEVER ALLOW THE VENT TO RUN DOWNWARD. This could cause high temperature and may present the possibility of a fire
(2)The location of the horizontal vent termination on the exterior wall must not be easily blocked or obstructed. Termination clearances are as follows: (SEE PAGE 8 IN THIS MANUAL)
(3)When installing a vent pipe in an enclosed chase the minimum clearance to combustibles is 4” inches (100 mm).
11