Enviro EG 33 owner manual

Page 6

Place the unit into the framed opening. Nail or screw the unit to the framing using the nailing flanges provided. MAKE SURE

THAT THE UNIT IS LEVEL AND PLUMB BEFORE NAILING OR SCREWING TO THE FRAMING MEMBERS. ALSO INSURE THAT THE BOTTOM OF THE UNIT IS LEVEL WITH THE FINISHED HEARTH HEIGHT.

Once the unit has been secured, install all venting according to local codes and guidelines and restrictions applied in this manual.

Install gas line from either the right or left side of the unit. Gas lines must be installed to meet local codes for the areas being installed.

Hook up all electrical connections for the convection blower and remote wall switch or thermostat if supplied.

The unit can now be enclosed with the rest of the house finishing. Place a sheet of drywall around the unit covering the nailing flanges and stopping on the unit body. Place the finished tile work or alternate facing material on top of the drywall so that the facing material does not extend past the nailing strip of the appliance.

(see diagram provided)

NOTE: The maximum thickness of any finished facing material around the unit is 1/2” (1.27 cm).

Reinstall logs, glass door, decorative surround panel, door fascia and top louvers

DRYWALL OR FINISHED WALL BOARD MATERIAL

TILE OR FINISHED

FIREPLACE SURROUND

NAILING FLANGES

LOCATED ON RIGHT SIDE,

LEFT SIDE AND THE TOP

OF UNIT.

SECURING HOLES

FOR SECURING THE

APPLIANCE BEFORE

FRAMING

BEVELED DECORATIVE SURROUND PANEL REMOVE THE FOUR SCREWS LOCATED BEHIND THE TOP AND BOTTOM LOUVERS AND REMOVE FROM THE STOVE

6

Image 6
Contents For Your Safety What to do if YOU Smell GASSafety Precautions GeneralTable of Contents Code ApprovalsMobile Home Deciding Where to Locate Your StoveDimensions ClearancesInstallation Framing DimensionsIncluding Finished Hearth Height Page Required Mantle Clearances Vent RestrictionsFlue Collar Installation Vent Terminal ClearancesPlanning Your Installation Vertical TerminationVenting Terminals Cannot be Recessed Into a Wall or Siding Horizontal Installation FIG-13 FIG-14 Vertical Installation FIG-16 FIG-17FIG-21 FIG-22 Installation of Logset and Embers Optional Ceramic PanelsFor Your Safety Read Before Operating Operating InstructionsRoutine Maintenance and Technical Do not Clean Glass When HOTTrouble Shooting Problem Possible Cause SolutionNever USE AN Open Flame for Leak Testing GAS Line ConnectionOrifice SIZES, Pressures and BTU’S Wire Size Maximum Length Installing or Removing the BlowerInstalling Remote Thermostat or Wall Switch ElectricalRemove the two 2 main burner orifices using a ½ deep socket Fuel ConversionWarranty Sign and verify that work and information are correctInstallation Data Sheet Mail Address envirofire@home.com