Avery 7112 HF user manual Installation, To Change Time Settings

Page 9

Installation

1.Place machine on solid table.

2.Connect compressed air service of 80 PSI to air regulator input.

3.Put main plug into source of a current AC 120 VAC @ 15 Amps.

4.Turn on main switch.

5.Fill hopper with labels/transfers (For labels, adhesive side down)

6.Press Load Button, vacuum cup should pick up label from hopper. Press the Feed Button to move the label/transfer from the hopper to the Electrode Plate (Sealing head). If cup does not pick up label:

A)Check position of hopper and adjust so that vacuum cup touches labels on edge of label covered with adhesive providing good suction.

B)The number on the vacuum gauge should read 16 or higher with label on cup.

7.With a label/transfer under the sealing head, activate the hand switches. Head should now descend - putting label/transfer on shirt with the pressure shown on air gauge

8.Leveling of the press should be checked to determine that the sealing head is parallel to the base. This can be checked by sealing a carbon paper order form in the machine. This should show a nice even pressure picture. An uneven condition can be adjusted with the bolt in the rear of the base plate.

To Change Time Settings

1.To begin sequence press “OK”.

2.Press cursor knob arrow down ⇓ (The word “Parameter” will appear).

3.Press “OK”.

4.T-1 will be flashing on right side

5.Press cursor knob left ⇐.

6.Use cursor knob up⇑ or down ⇓ to change to desired time setting.

7.Press “OK”.

8.Press “ESCAPE” twice.

Users Manual Electro-Sealer 7112 HF

Installation 5

Image 9
Contents Electro-Sealer 7112 HF This page left blank intentionally Contents Pneumatic Drawings Limited Warranty Warranty InformationService PartsRead ALL Instructions Carefully Safety InstructionsModel 7112 Hopper Feed Heat Sealer Unit Specification To Change Time Settings InstallationLCD General Description Auto SwitchBasic Sealing Leveling the Press Operation Setting the ControlsOperation Security Level Selection Password TableSeries Hopper Feed Regular MaintenanceSymptoms Probable Cause Corrective Action Trouble ShootingSymptoms Probable Cause Corrective Action Symptoms Probable Cause Corrective Action Sealing ProblemsElectrical Drawings TB-3 Electrical Schematic Part7112 HF Hand SW R/H Yellow Brown Black Blue Hand SW L/H TOP Platen Bottom Platen Heater 300 Watt Pneumatic Drawings 70205326 Pneumatic SchematicPage Assembly Drawings Front Panel Assembly Drawing and Cover Front Panel Parts List Frame and Cover Assembly Drawing Frame and Cover Parts List Main Cylinder & Cabinet Assembly Drawing Main Cylinder & Cabinet Parts List Main Cylinder / Platen Assembly Drawing Main Cylinder / Platen Parts List Swing Arm & Base Plate Assembly Drawing Swing Arm & Base Plate Parts List Manifold Assembly Drawing Manifold Parts List Vacuum & Regulator Assembly Drawing Vacuum & Regulator Parts List Hopper Feed Assembly Drawing Hopper Feed Parts List 11 12 8 Bracket, Hopper side rail, RH