Woods Equipment LU126 installation manual Hose Kit Verification of Control Movements

Page 18

1010460 Hose Kit

Verification of Control Movements

1.Mount loader to tractor: Remove mount pins from loader uprights. Align tractor with loader and lowly drive tractor into loader. Shut off tractor.

2.Connect loader feedline hoses to control valve hydraulic couplers (See Figure 29).

NOTE: At least 6" spacing should be maintained between valve, bracket, or hoses and any tractor control (brake pedals, accelerator, hand throttle, or hydraulic levers).

3.Comply with all Safety Rules and start the tractor.

4.Mount loader to tractor by activating bucket cylinders to raise or lower the loader uprights into the loader mounts. Slowly advance tractor forward, activating appropriate cylinders to engage loader completely into mounts. Insert mounting pins to secure loader.

5.Check that all hydraulic control lever positions operate the loader movements correctly as shown in Figure 30.

6.If loader movements do not respond correctly, shut off tractor, relieve pressure, and reconnect properly. Loader control movements must be correct before proceeding.

7.Once all loader functions are correct, start the tractor and operate the loader to check for leaks. Purge any remaining air from the hydraulic system.

8.When hose routings and correct loader operations are verified, identify each circuit by placing a matching colored band around the male and female quick-disconnect coupler set. The colored bands will make re-installation easier when the loader is remove from the tractor.

9.Be sure the adequate slack is left in the hoses so they can move as the loader moves through its full range of motion.

10.Attach plastic tie straps every 20" around the hoses to keep them tightly bound and away from contact with the ground or other moving parts on tractor.

11.Before operating the loader, make sure that the Pre-Delivery, Delivery, and Pre-Operation Checklists from the Operation section in the Loader Operator’s Manual have been completed.

Handle forward - Boom down

Handle forward to limit - Float position

Handle back - Boom up

Handle right - Dump bucket or attachment

Handle to left - Rollback bucket or attachment

Figure 30. Single Lever Control Operation

18 Hydraulic Installation

MAN0041 (Rev. 4/4/2008)

 

 

Image 18
Contents MAN0041 Introduction To the DealerSafety Safety RulesMount Installation Loader Mount InstallationTractor Preparation Install Right and Left Rear Mounts Install Grill Guard OptionalInstall Weather Cap on Exhaust Pipe Torque HardwareHydraulic Installation Hose KIT InstallationGeneral Description Hose Routing Typical Installation Hose Kit Assemble and Route HosesInstall Hose Hangers Hose Kit Connect Hoses to TractorMount loader to tractor Remove mount pins Hose Kit Verify Control MovementsAdjust Control Valve Install Hose GuideInstall Hydraulic Fittings and Hoses Hose Kit Attach Hoses to Control ValveHose Kit Install Hydraulic Fitting and Hoses Hydraulic Fitting and Hose InstallationHose Kit Install Hose Hanger Connect Work Port HosesHose Kit Verification of Control Movements Single Lever Control OperationInstall Hydraulic Fitting to Tractor Valve Tractor Hydraulic Control Lever and ValveHose Kit Assemble Loader Hoses Connect Hoses to Tractor ValveHose Kit Verification of Control Movements Tractor Remote Control Lever Hose Kit Assemble Loader Hoses Hose Kit Verification of Control Movements Assemble Hoses Tractor Rear Hydraulic Couplers TypicalLoader Feedline to Tractor Remote Coupler Connections Install Hydraulic Fittings to Control Valve Control Valve Installed TypicalHose Kit Install Hydraulic Fittings and Hoses Hydraulic Fittings and Hose ConnectionsHose Kit Install Hose Hanger Hose Kit14 Verification of Control Movements Parts Loader Mounting KIT1020, 1027 Loaders LU126, LU132 LoadersStandard hardware, obtain locally Parts 58677 Support bracket not used 54305 Hose kit are used for this application Bolt Torque Chart AppendixBolt Size Chart AbbreviationsWarranty Part or MAN0041