1023583 Hose Kit14

Verification of Control Movements

1.Mount loader to tractor: Remove mount pins from loader uprights. Align tractor with loader and lowly drive tractor into loader. Shut off tractor.

2.Connect loader feedline hoses to control valve hydraulic couplers (See Figure 50).

3.Comply with all Safety Rules and start the tractor.

4.Mount loader to tractor by activating bucket cylinders to raise or lower the loader uprights into the loader mounts. Slowly advance tractor forward, activating appropriate cylinders to engage loader completely into mounts. Insert mounting pins to secure loader.

5.Check that all hydraulic control lever positions operate the loader movements correctly as shown in Figure 51.

6.If loader movements do not respond correctly, shut off tractor, relieve pressure, and reconnect properly. Loader control movements must be correct before proceeding.

7.Once all loader functions are correct, start the tractor and operate the loader to check for leaks. Purge any remaining air from the hydraulic system.

8.When hose routings and correct loader operations are verified, identify each circuit by placing a matching colored band around the male and female quick-disconnect coupler set. The colored bands will make re-installation easier when the loader is remove from the tractor.

9.Be sure the adequate slack is left in the hoses so they can move as the loader moves through its full range of motion.

10.Attach plastic tie straps every 20" around the hoses to keep them tightly bound and away from contact with the ground or other moving parts on tractor.

11.Before operating the loader, make sure that the Pre-Delivery, Delivery, and Pre-Operation Checklists from the Operation section in the Loader Operator’s Manual have been completed.

Handle forward - Boom down

Handle forward to limit - Float position

Handle back - Boom up

Handle right - Dump bucket or attachment (slow)

Handle right to limit - Dump bucket or attachment (fast)

Handle to left - Rollback bucket or attachment

Figure 51. Single Lever Control Operation

MAN0041 (Rev. 4/4/2008)

Hydraulic Installation 27

 

 

Image 27
Contents MAN0041 To the Dealer IntroductionSafety Rules SafetyMount Installation Loader Mount InstallationTractor Preparation Install Grill Guard Optional Install Right and Left Rear MountsTorque Hardware Install Weather Cap on Exhaust PipeHydraulic Installation Hose KIT InstallationGeneral Description Hose Kit Assemble and Route Hoses Hose Routing Typical InstallationHose Kit Connect Hoses to Tractor Install Hose HangersHose Kit Verify Control Movements Mount loader to tractor Remove mount pinsInstall Hose Guide Adjust Control ValveHose Kit Attach Hoses to Control Valve Install Hydraulic Fittings and HosesHydraulic Fitting and Hose Installation Hose Kit Install Hydraulic Fitting and HosesConnect Work Port Hoses Hose Kit Install Hose HangerSingle Lever Control Operation Hose Kit Verification of Control MovementsTractor Hydraulic Control Lever and Valve Install Hydraulic Fitting to Tractor ValveConnect Hoses to Tractor Valve Hose Kit Assemble Loader HosesHose Kit Verification of Control Movements Tractor Remote Control Lever Hose Kit Assemble Loader Hoses Hose Kit Verification of Control Movements Tractor Rear Hydraulic Couplers Typical Assemble HosesLoader Feedline to Tractor Remote Coupler Connections Control Valve Installed Typical Install Hydraulic Fittings to Control ValveHydraulic Fittings and Hose Connections Hose Kit Install Hydraulic Fittings and HosesHose Kit Install Hose Hanger Hose Kit14 Verification of Control Movements Loader Mounting KIT PartsLU126, LU132 Loaders 1020, 1027 LoadersStandard hardware, obtain locally Parts 58677 Support bracket not used 54305 Hose kit are used for this application Appendix Bolt Torque ChartAbbreviations Bolt Size ChartWarranty Part or MAN0041