Woods Equipment 111877 manual Hydraulic Installation, Hose Kit Install Hose Hanger

Page 14
1001420 Hose Kit

1001420 Hose Kit

Install Hose Hanger

1.Install hose hanger bracket (8) under platform between brake pedals and chassis as shown in Figure 17.

2.Secure with hex head cap screw (10), flat washers (11), and lock nut (12).

3.Route hoses through hose hanger bracket and up behind right platform as shown in Figure 18.

4.Secure hoses in hose hanger with lock pin (9).

5.Secure hoses every 20 inches with plastic ties.

8.58033 Hose hanger bracket

9.58047 1/4 x 2-1/2 Lock pin

10.

6250 5/16 NC x 1-1/4 HHCS

Figure 17. Hose Hanger Installed

 

 

11.4378 5/16 Standard flat washer

12.6778 5/16 NC Lock nut

Figure 18. Hose Routing

Connect Loader Feedline Hoses

1.The control valve kit contains hoses assembled with quick couplers. Attach the hoses to loader feedlines, following the color pattern.

2.Connect loader supply hoses to control valve hydraulic couplers when attaching loader.

Figure 19. Control Valve and 1020/1027 Loader Feedline Connections

14 Hydraulic Installation

MAN0064 (Rev. 7/20/2007)

 

 

Image 14
Contents for 1020, 1027, LU126 Loaders Loader safety111877 LOADER MOUNTING KIT includes Hose Kits 57923TO THE OWNER 2IntroductionTO THE DEALER ModelINSTALLATION SafetySAFETY RULES ATTENTION! BECOME ALERT! YOUR SAFETY IS INVOLVEDTRACTOR PREPARATION 4 Mount InstallationLOADER MOUNT INSTALLATION Figure 1. Rear Mount Installation Mount InstallationInstall Right and Left Rear Mounts Figure 2. Left rear Mount InstalledInstall Right and Left Side rails 6 Mount InstallationInstall Front Mount Torque Hardware Install Grill Guard OptionalTORQUE SPECIFICATIONS Cap Screw8 Mount Installation Install Hose Fittings Hydraulic InstallationHOSE KIT INSTALLATION 57923 HOSE KIT59723 Hose Kit 10 Hydraulic InstallationInstall Hose Hanger Route Hydraulic Hoses57923 Hose Kit Verify Control Movements Figure 13. 2-SpoolControl Valve Installed Typical 12 Hydraulic InstallationInstall Adapter Plate 1001420 HOSE KIT1001420 Hose Kit Install Hoses Connect Loader Feedline Hoses 14 Hydraulic Installation1001420 Hose Kit Install Hose Hanger 1001420 Hose Kit Verify Control Movements 16 Hydraulic Installation 1023582 HOSE KIT1023582 Hose Kit Install Hoses Verify Control Movements 18 Hydraulic Installation1023582 Hose Kit Connect Loader Feedline Hoses 1023596 HOSE KIT 20 Hydraulic Installation 1023596 Hose Kit Verify Control MovementsPART Parts111877 LOADER MOUNTING KIT DESCRIPTIONREF PART QTY 22 Parts1020/1027 LOADERS LU126 LOADER 24 Parts 10120/1027 LOADERSCHART BOLT TORQUE CHARTSAE SERIES A TORQUE CHART InstallationsABBREVIATIONS BOLT SIZE CHART26Appendix SAE Bolt Thread Sizes2606 South Illinois Route Post Office Box WARRANTYWoods Equipment Company Oregon, Illinois 61061 USA 800-319-6637telF-8494Rev. 6/23/2005