Woods Equipment 111877 Mount Installation, Install Front Mount, Install Right and Left Side rails

Page 6
Install Front Mount

Install Front Mount

1.Insert four (two per side) carriage bolts (13) into upper holes of front mount prior to attaching to tractor. Carriage bolts should be inserted from the inside pointing outward.

2.Attach front support (3) to tractor, using two cap screws (17) and hardened flat washers (15).

3.1001642 Front mount

13.301130 5/8 NC x 1-1/2 Carriage bolt GR5

15.57817 5/8 Hardened flat washer

17.902 5/8 NC x 2 HHCS GR5

Install Right and Left Side rails13

156 Mount Installation

DP2

17

Figure 3. Front Mount Installed

Install Right and Left Side rails

1.Place front holes of right side rail (4) over carriage bolts (13) and front mount and secure with hard- ened flat washers (15) and hex nuts (10).

2.Attach side rail to inside of rear mount, using four carriage bolts (13), hardened flat washers (15) and hex nuts (10).

Carriage bolts must be installed with heads on inside of rear mount as shown in Figure 6.

3.Repeat steps to install left side rail (5).

4.1026492 Right side rail

5.1026493 Left side rail

10.230 5/8 NC Hex nut

13.301130 5/8 NC x 1-1/2 Carriage bolt GR5

15.57817 5/8 Hardened flat washer

Figure 4. Right Side Rail Installation

Manual background13

15

10

DP3

13

DP4

15

10

Figure 5. Side Rail to Front Mount

Figure 6. Side Rail to Rear Mount

6 Mount Installation

(Rev. 05/18/2010)

MAN0064 (Rev. 7/20/2007)

Image 6
Contents for 1020, 1027, LU126 Loaders Loader safety111877 LOADER MOUNTING KIT includes Hose Kits 57923TO THE OWNER 2IntroductionTO THE DEALER ModelINSTALLATION SafetySAFETY RULES ATTENTION! BECOME ALERT! YOUR SAFETY IS INVOLVED4 Mount Installation LOADER MOUNT INSTALLATIONTRACTOR PREPARATION Figure 1. Rear Mount Installation Mount InstallationInstall Right and Left Rear Mounts Figure 2. Left rear Mount Installed6 Mount Installation Install Front MountInstall Right and Left Side rails Torque Hardware Install Grill Guard OptionalTORQUE SPECIFICATIONS Cap Screw8 Mount Installation Install Hose Fittings Hydraulic InstallationHOSE KIT INSTALLATION 57923 HOSE KIT59723 Hose Kit 10 Hydraulic InstallationInstall Hose Hanger Route Hydraulic Hoses57923 Hose Kit Verify Control Movements Figure 13. 2-SpoolControl Valve Installed Typical 12 Hydraulic InstallationInstall Adapter Plate 1001420 HOSE KIT1001420 Hose Kit Install Hoses 14 Hydraulic Installation 1001420 Hose Kit Install Hose HangerConnect Loader Feedline Hoses 1001420 Hose Kit Verify Control Movements 16 Hydraulic Installation 1023582 HOSE KIT1023582 Hose Kit Install Hoses 18 Hydraulic Installation 1023582 Hose Kit Connect Loader Feedline HosesVerify Control Movements 1023596 HOSE KIT 20 Hydraulic Installation 1023596 Hose Kit Verify Control MovementsPART Parts111877 LOADER MOUNTING KIT DESCRIPTION22 Parts 1020/1027 LOADERSREF PART QTY LU126 LOADER 24 Parts 10120/1027 LOADERSCHART BOLT TORQUE CHARTSAE SERIES A TORQUE CHART InstallationsABBREVIATIONS BOLT SIZE CHART26Appendix SAE Bolt Thread Sizes2606 South Illinois Route Post Office Box WARRANTYWoods Equipment Company Oregon, Illinois 61061 USA 800-319-6637telF-8494Rev. 6/23/2005