Miller Electric 6000 manual Grounding When Supplying Building Systems, Earth ground if supplying

Page 39

11-3. Grounding When Supplying Building Systems

 

 

1

Equipment Grounding

1

2

 

Terminal

2

Grounding Cable

GND/PE

 

 

Use #10 AWG or larger insulated

 

 

 

 

copper wire.

 

 

3

Ground Device

 

 

Y Ground generator to system

 

 

 

earth ground if supplying

 

 

 

power to a premises (home,

 

 

 

shop, farm) wiring system.

Use ground device as stated in electrical codes.

23

ST-800 576-B

11-4. How Much Power Does Equipment Require?

3

2

1

3

VOLTS 115 AMPS 4.5

Hz 60

1 Resistive Load

A light bulb is a resistive load and requires a constant amount of power.

2 Non-Resistive Load

Equipment with a motor is a non-re- sistive load and requires approxi- mately six times more power while starting the motor than when running (see Section 11-8).

3 Rating Data

Rating shows volts and amperes, or watts required to run equipment.

AMPERES x VOLTS = WATTS

EXAMPLE 1: If a drill uses 4.5 amperes at 115 volts, calculate its running power requirement in watts.

4.5 A x 115 V = 520 W

The load applied by the drill is 520 watts.

EXAMPLE 2: If three 200 watt flood lamps are used with the drill from Example 1, add the individual loads to calculate total load.

(200 W + 200 W + 200 W) + 520 W = 1120 W

The total load applied by the three flood lamps and drill is 1120 watts.

S-0623

Return To Table Of Contents

OM-499 Page 35

Image 39
Contents OM-499 ProcessesDescription From Miller to You Table of Contents Page Arc Welding Hazards Symbol UsageEngine Hazards Compressed Air Hazards Radiation can cause interference Principal Safety StandardsCalifornia Proposition 65 Warnings EMF InformationLES Fumées ET LES GAZ peuvent être dangereux Signification des symboles− Consignes DE Sécurité − Lire Avant Utilisation UN Choc Électrique peut tuerLE Bruit peut affecter l’ouïe LE Soudage peut provoquer un in- cendie ou une explosionDES Particules Volantes peuvent blesser les yeux DES Pièces Chaudes peuvent provoquer des brûlures graves’AIR Comprimé peut provoque r des blessures ’EXPLOSION DE LA Batterie peutDES Organes Mobiles peuvent provoquer des blessures LA Chaleur DU Moteur peut pro- voquer un incendieInformation sur les champs électromagnétiques Principales normes de sécuritéWelding Weld Output Rated Maximum Generator Power − SpecificationsSymbol Definitions Weld, Power, And Engine SpecificationsBe damaged or unit could tip Dimensions, Weights, And Operating AnglesFuel Consumption Kohler-Powered Units Do not move or operate unit where itContinuous Welding Fuel Consumption Honda-Powered UnitsExceeding duty cycle can damage unit and void warranty Duty CycleHz Model Generator Power CurvesMAX MID MIN Volt-Ampere Curves− Installation Installing Welding GeneratorGrounding Generator To Truck Or Trailer Frame Oil Grounding Generator When Supplying Building SystemsEngine Prestart Checks Kohler-Powered Units FuelConnect negative − cable last Engine Prestart Checks Honda-Powered UnitsConnecting The Battery Electric-Start Models Only + −Selecting Weld Cable Sizes Connecting To Weld Output TerminalsControls Kohler-Powered Units − Operating the Welding Generator50 Hz 60 Hz Controls Honda-Powered Units See Section Recoil-Start 2Electric-Start60 Hz 50 Hz Description Of Controls Honda-Powered Units See Section Generator Power Panel 495 218 USA − Operating Auxiliary Equipment120 V x 10 a + 240 V x 9 a = 3.5 kVA/ KW Australia Europe Asia Optional Generator Power PanelsGenerator Power Panel 495 South Africa South AmericaIt exceeds 5500W Generator Power Panel RatingsMaintenance Label − Maintenance100 h Routine Maintenance20 h 50 hIdle Speed Adjustment Overload Protection Honda-Powered UnitsAdjusting Engine Speed Kohler-Powered Units Weld/Power Speed AdjustmentStop engine. Close fuel valve Adjusting Engine Speed Honda-Powered UnitsThrottle Control Lever Adjustment Screw Pilot Screw Throttle Stop ScrewWelding − TroubleshootingTroubleshooting Generator PowerCircuit board PC1 Check battery voltage electric-start models onlyViscosity oil for operating temperature EngineCircuit Diagram For Welding Generator 1 − Electrical DiagramsCircuit Diagram For Welding Generator 2 Wiring Diagram For Auxiliary Power Panels 1 Wiring Diagram For Auxiliary Power Panels 2 Selecting Equipment − Generator Power GuidelinesVolts 115 Amps Resistive Load Grounding When Supplying Building SystemsHow Much Power Does Equipment Require? Earth ground if supplyingFarm/Home Equipment Rating Starting Watts Running Watts Approximate Power Requirements For Industrial MotorsApproximate Power Requirements For Farm/Home Equipment Industrial Motors Rating Starting Watts Running WattsContractor Rating Starting Watts Running Watts Approximate Power Requirements For Contractor EquipmentKVA/HP x HP x Power Required To Start MotorHow Much Power Can Generator Supply? Single-Phase Induction Motor Starting RequirementsWork like a Pro Typical Connections To Supply Standby PowerCurrent Load Watts Amperes Selecting Extension Cord Use Shortest Cord PossibleStick Welding Procedure Weld current starts when electrode touches work- piece− Stick Welding Smaw Guidelines Electrode and Amperage Selection Chart Striking an Arc − Scratch Start TechniqueStriking an Arc − Tapping Technique 10-30 9090 End View of Work Angle Poor Weld Bead CharacteristicsGood Weld Bead Characteristics Positioning Electrode HolderElectrode Movement During Welding Conditions That Affect Weld Bead Shape16 in 1.6 mm Tack Welds Butt JointsLap Joint Tee JointPossible Causes Corrective Actions Troubleshooting − PorosityTroubleshooting − Excessive Spatter Weld TestTroubleshooting − Incomplete Fusion Troubleshooting − Lack Of PenetrationTroubleshooting − Excessive Penetration Troubleshooting − Burn-Through Troubleshooting − Waviness Of BeadTroubleshooting − Distortion Main Assembly − Parts ListDia Part Dia Part Mkgs Description Quantity Generator Power Panels Item Dia Part Mkgs Description Quantity Work like a Pro Service Your distributor also givesSupport Transportation Department Miller Electric Mfg. CoFor assistance in filing or settling claims, contact Your distributor and/or equipment manufacturer’s