Kohler 116347-2 manual Installation, Install the Tower

Page 21

INSTALLATION

INSTALL THE TOWER

Locate the pin at the bottom left corner of the tower￿ Insert this pin into the bottom left corner hole in the mounting frame bracket￿ Now line up the hole at the top left corner of the tower with the slotted hole in the mounting frame, and thread a 3/￿7inch bolt through the mounting frame and into the tower￿ Securely wrench tighten the bolt￿

Route the tower cable through the large hole in the mounting frame￿ Snap the tower cable modular plug into the corresponding jack of the control box￿ Install the large strain relief bushing over the tower cable, and insert it into the large mounting frame hole￿

NOTE: National Electrical Code requires that you permanently separate the high7 and low7voltage cables￿

Route the waterfall light wires through the small

hole in the back of the mounting frame￿ Connect the waterfall light wire connectors to the transformer terminals - white to white; black to black￿ Install the small strain relief bushing over the waterfall light wires, and insert it into the small mounting frame hole￿

Securely handtighten the tower union nut to the mounting frame union￿ Be sure the union O7ring is in place￿

Carefully pivot the tower closed￿ Line up the holes at the top and bottom right corners of the tower with the slotted holes in the mounting frame￿ Thread a 3/￿7inch bolt through the mounting frame and into the tower at the top and bottom￿ Tighten the bolts securely, but do not overtighten￿

You will water test and inspect the tower and mounting frame later, so you may want to only install and handtighten one of the required bolts at this time￿ Both bolts will need to be securely tightened later￿

11￿347727AA (A)

22

Kohler Co￿, Kohler, WI

Image 21
Contents EI IE Design Guide Provide Sufficient AccessTower and System Room SizePump BOX WATER%FREE ZoneSuction Assembly Wiring ConnectionsEsin UIE Rain LoationWaterproofin Material WATER*RESISTANT Wall Material Cement BoardFinished Wall Material Keypad Control LocationFootbath Basin Auxiliary Heat Sources Primary Heat SourceFaucets and Fittings Project Requirement SummaryCustom Bodyspa Installation Instructions InstallationEetri Requireets FeturesIallai Install Tower Mounting Frame Install Pump BOXPlumbing Preparation Install the Variable Flow Valve Assembly Install the Suction Bracket Make Electrical Connections Solvent Weld TubingInstall Cable Without Outlet BOX Install Cable with Outlet BOXInstall Suction Bushing Install Waterproofing Membrane or CompoundInstall Cement Board Install WATER0RESISTANT Wall MaterialConstruct Footbath Basin Strut Fiise SI, WS, EII IA E D ECE DAIInstall the Tower Install the Keypad Water Test the System CLEAN/UP After InstallationSymptoms Probable Causes Corrective Action TroubleshootingCustom Bodyspa Users Information Users InformationInformation UsersLets GET Started Care and Cleaning of Your Custom Bodyspa Service and Warranty Information Page Publication No AA2 a E 1999 Kohler Co., Kohler, WI