Kohler 116347-2 manual Install the Keypad

Page 22

INSTALL THE KEYPAD

CAUTION: Risk of personal injury or

product damage. The metal plate must be installed flush with the finished wall or slightly recessed (maximum 1/41inch)￿

Feed the cable through the hole in the metal plate￿ Use two flathead screws to attach the metal plate to the outlet box or finished wall material so the

metal plate flushis with the finished wall or slightly recessed (maximum 1/41inch)￿

Snap the keypad modular plug into the keypad cable jack￿

Apply silicone sealant to each of the keypad screw holes and around the keypad edges, and secure the keypad to the metal plate with four panhead screws￿

CAUTION: Risk of personal injury or product damage. Prevent water damage to the keypad by applying silicone sealant as instructed￿

IMPORTANT! Apply a continuous bead of clear silicone sealant to the cover plate sealant grooves, as shown.

Slip the center pin at the top of the cover plate up through the hole in the keypad￿ Secure the cover plate to the keypad with a panhead screw￿

Select the bottom cap - it contains a small pinhole, and has a small notched area along the contact surface edge￿

IMPORTANT! Apply clear silicone sealant to

the back surface of the bottom cap, and also to the edge that contacts the cover plate. Align the bottom cap holes with the cover plate pins, and push the cap into place. Repeat for the top cap.

Remove any excess sealant￿

INSTALLATION

Check Point #9

-Faucet trim and spout installed.

-Drain assembly installed.

-Footbath basin filled with water and checked for leakage.

-Door enclosure installed.

-Tower installed.

-Keypad installed and sealed with silicone sealant.

-Keypad wiring connections made.

11￿347121AA (A)

23

Kohler Co￿, Kohler, WI

Image 22
Contents EI IE Tower and System Provide Sufficient AccessDesign Guide Room SizeWATER%FREE Zone Pump BOXWiring Connections Suction AssemblyRain Loation Esin UIEWaterproofin Material Finished Wall Material Cement BoardWATER*RESISTANT Wall Material Keypad Control LocationFootbath Basin Faucets and Fittings Primary Heat SourceAuxiliary Heat Sources Project Requirement SummaryInstallation Custom Bodyspa Installation InstructionsFetures Eetri RequireetsIallai Install Pump BOX Install Tower Mounting FramePlumbing Preparation Install the Variable Flow Valve Assembly Install the Suction Bracket Solvent Weld Tubing Make Electrical ConnectionsInstall Cable with Outlet BOX Install Cable Without Outlet BOXInstall Waterproofing Membrane or Compound Install Suction BushingInstall WATER0RESISTANT Wall Material Install Cement BoardConstruct Footbath Basin Strut Fiise SI, WS, EII DAI IA E D ECEInstall the Tower Install the Keypad CLEAN/UP After Installation Water Test the SystemTroubleshooting Symptoms Probable Causes Corrective ActionUsers Information Custom Bodyspa Users InformationUsers InformationLets GET Started Care and Cleaning of Your Custom Bodyspa Service and Warranty Information Page Publication No AA2 a E 1999 Kohler Co., Kohler, WI