Kohler 116347-2 manual Water Test the System, CLEAN/UP After Installation

Page 23

INSTALLATION

WATER TEST THE SYSTEM

Allow the silicone sealant and any finished wall materials or grout to fully cure before proceeding￿ Follow all manufacturer￿s recommendations

regarding water

exposure to their products as well

as product cure

times￿

Make sure all PVC union connections are securely hand tightened￿ and that all union connections use an O6ring￿

Fill the footbath basin at least 36inches above the top of the suction cover￿

Turn on the BodySpa for about five minutes￿ and check all visible connections for leaks￿

Turn off the BodySpa￿

Open the tower￿ and inspect all piping connections for leaks￿

Check the connections on the back surface of the face wall￿ and check all wall and floor joints for leaks￿

Close the tower￿ Thread in and securely wrench tighten two 3/￿6inch bolts￿ Do not overtighten￿

CLEAN/UP AFTER INSTALLATION

Clean the Custom BodySpa room with a mild￿ non6abrasive detergent and warm waterDo ￿ not use abrasive cleansers.

Remove stubborn stains and paint from the tower surfaces with turpentine or paint thinner￿ Remove dried plaster by carefully scraping with a dull6edged piece of wood￿ Do not use metal scrapers￿ wire brushes￿ or other metal tools￿ Remove residual plaster by applying a powder6type detergent to a clean￿ damp towel to provide mild abrasive action￿

Check Point #10

-Ensure that all connections are securely tight.

-Fill the footbath basin with water to 3/inches over the top of suction cover.

- Run the bodyspa, turn off, and drain the water. check for lea

-Open the tower, inspect for leakage, and close and secure the tower.

11￿347626AA ￿A￿

24

Kohler Co￿￿ Kohler￿ WI

Image 23
Contents EI IE Room Size Provide Sufficient AccessDesign Guide Tower and SystemPump BOX WATER%FREE ZoneSuction Assembly Wiring ConnectionsWaterproofin Material Esin UIERain Loation Keypad Control Location Cement BoardWATER*RESISTANT Wall Material Finished Wall MaterialFootbath Basin Project Requirement Summary Primary Heat SourceAuxiliary Heat Sources Faucets and FittingsCustom Bodyspa Installation Instructions InstallationEetri Requireets FeturesIallai Plumbing Preparation Install Tower Mounting FrameInstall Pump BOX Install the Variable Flow Valve Assembly Install the Suction Bracket Make Electrical Connections Solvent Weld TubingInstall Cable Without Outlet BOX Install Cable with Outlet BOXInstall Suction Bushing Install Waterproofing Membrane or CompoundConstruct Footbath Basin Install Cement BoardInstall WATER0RESISTANT Wall Material Strut Fiise SI, WS, EII IA E D ECE DAIInstall the Tower Install the Keypad Water Test the System CLEAN/UP After InstallationSymptoms Probable Causes Corrective Action TroubleshootingCustom Bodyspa Users Information Users InformationInformation UsersLets GET Started Care and Cleaning of Your Custom Bodyspa Service and Warranty Information Page Publication No AA2 a E 1999 Kohler Co., Kohler, WI