INSTALLATION
Unpacking
Unpack the
The operator’s manual includes detailed instructions about safety, assembly, use, and maintenance of the
Parts that are included are pictured in the Description section on page
1.Rail sections (quantity according to the order)
2.Saw carriage
3.Feed unit
4.4 rail guards
5.Bar and chain
6.Assembly components
Installation
Installation Site
The
There should be space to lay out timber and sawn wood.
Rails
Place the rail sections after each other on the transverse wooden beams, which are placed under each log bolster, and an extra transverse wooden beam by the joints between the sections.
Continue as follows:
1.Assemble the adjustable feet under each of the 16 log bolsters. Adjust, by using the adjustable feet and the rails’ bedding, until the rail sections form a straight line and the rails sit firmly on each wooden beam. See FIG. 21.
2.Loosely bolt together the rail sections using the supplied jointing plates and M12 nuts and bolts. See FIG. 23.
3.Finely adjust the rails and tighten all the bolts. Tighten the bolted joints to
4.Fit the stops to the ends of the rails (see page 14, FIG. 11), as well as the folding stops, log lift, and log lock (see page 13, FIG. 10).
5.Load the rails above each wooden beam and check that the rails do not move.
FIG. 21 |
Aligning the rails
FIG. 22 |
Adjustable foot
FIG. 23 |
Bolted joint
16