7)While pulling on the wire, SLOWLY operate hoist in the DOWN direction to thread the load chain over the load sheave. Make sure the chain feeds smoothly while operating the hoist. If binding occurs, stop and SLOWLY operate the hoist in the up direction to the back the chain out, then reorient the load sheave as instructed in step 5 before attempting to reinsert the load chain.
8)Operated the hoist in the down direction until sufficient there is sufficient load chain to reeve the hoist.
9)Reeve the chain through the bottom hook assembly. Remove the wire from the Load chain and attach the
10)After installation has been completed, perform steps outlined in Section 3.12 "Preoperational Checks and Trial Operation".
10 Ton TCR10000P2 & TCR10000C2 | 25 Ton TCR25000P2 & TCR25000C2 |
Figure 7-3 Diagram showing chain replacement
35