Aquatic Infinity Series owner manual Structural Preparation, Leveling of the Infinity

Page 8

INSTALLATION INSTRUCTIONS

STRUCTURAL PREPARATION (continued):

5.When placing the tub on a platform or cut out (see Diagrams), the opening should be 1” smaller than the specified rim dimensions. Extreme care must be taken in this type of installation to ensure the tub will come to rest entirely on the leveling feet.

6.IF YOU HAVE PURCHASED A WHIRLPOOL WITH AN INSTALLED TILE FLANGE, PROCEED TO INSTRUCTION "2A".

LEVELING OF THE INFINITY I:

1.With a six foot level, level whirlpool left to right (see Diagram IF). Make sure that the level is placed on the flat surface of the whirlpool, and not resting on the hump of the backrest or the tile flange.

1F

2.Next, level the whirlpool front to back (see Diagram 1G). Put one end of the level on the center of the recirculating discharge screen and the other end on the front lip of the whirlpool. Place a 3/8” spacer between the level and the front lip of the whirlpool.

Add 3/8” Spacer

Underneath Level

1G

3.After leveling the front to back of the whirlpool, check the left to right level. If not level, re-adjust until level. Check again until left to right and front to back are both level.

AQUATIC INDUSTRIES, INC.

9

Image 8
Contents Infinity Series Table of Contents Purchase Registration Warranty ConfirmationOwner Information Congratulations Read and Follow ALL Instructions PRE-INSTALLATION Procedures Installation Instruction GuidelinesRead ALL Instructions Carefully Before Installation Installation Instructions Structural PreparationStructural Preparation Leveling of the InfinitySee Illustration 2A Factory Installed Tile FlangePlumbing Fast Fill Waterfall Spout ROUGH-IN MeasurementsModel Electrical Installation Continuous Waterfall InfinityPlease see Diagrams 4A and 4B. BlowerInfinity Electronic T-HEATER Model Number HS Chromatherapy LED Lighting Bathside Control Systems Infinity ON/OFF with Heater Control see Diagram 6AInfinity Series Whirlpools Infinity JET Sequencer Control see Diagram 6B Infinity AIR Bath Control see Diagram 6CInfinity AIR Bath Purge Cycle see Diagram 6C Purge 24 HoursTo adjust pressure see Diagram 7B To replace or change jet see Diagram 7DTo Remove/Replace Pillow see Diagram 8A JET OperationsTo adjust pressure see Diagram 8B To replace or change jet see Diagram 8CTo adjust pressure see Diagram 9A To replace or change jet see Diagram 9CTo adjust pressure see Diagram 10A To adjust circular patternTo adjust pressure see Diagram 11A To replace or change jet see Diagram 11BFCC Consumer Information Electrical Installation Information Listed on pagesWhirlpool User Information Maintenance and Care Initial CleaningWhirlpool System Cleaning AIR Bath System CleaningSurface Cleaning JET CleaningWater Quality Issues Surface Scratch RemovalWater Quality Issues Chemical QualityTreatment Troubleshooting Guide Symptoms Possible Problems Suggested SolutionsReplacement Parts Order Form How To UseQuantity Description Color/Finish Price Please Fill OUT CompletelyReplacement Parts Order MAP Infinity SeriesAssorted Fittings Replacement Parts Order MAP 27a 27b 28a 28b 28c F I N I T Y B a T H P a R T S L I S T Assorted Fittings Aquatic Industries, Inc. Limited Lifetime Warranty IOM6 12/05