2-16 CHAPTER 2: INSTALLING THE LINKBUILDER MSH
DUA1800-0AAA04
1Remove the three screws that secure the display panel to the MSH
chassis.
2Carefully disengage the flexi-ribbon connector taking care not to
bend the pins on the connector, and move the panel away from
the chassis.
Installing The Display Panel
Refer to Figure 2-7.
Before carrying out this procedure, you will need to decide which
installation position for the display pane l best suits your set-up.
The display panel can be fitted to the front face (the face with the
network and power supply connections) or the rear face of the
MSH if you need to keep the front of the chassis free from cables.
However, remember that when the chassis is viewed from the
rear, module LEDs will not be visible, the only indication to the
user will be the single LED per sl ot on the display panel.
Fitting the display panel to the rear of the MSH. When fitting the
display panel to the rear of the u nit, the ventilation panel must
first be removed and should be refitted into the p osition left by
the display panel at the front of the unit. The procedure for fi tting
the ventilation panel is similar to that for the display panel.
To install the display panel, you will need a small, cross-head
screwdriver.
The procedure for installing the display panel is identical whether
you are installing it into the front or rear of the chassis.
1Lift the display panel into position with the buttons and LCD
character display facing towards you.
2Fit the flexi-ribbon connector, that emerges from the chassis to
the socket on the rear of the display panel and press firmly to
Chassis.bk : CHAPTER2 Page 16 Monday, February 10, 1997 1:11 PM