2-24 CHAPTER 2: INSTALLING THE LINKBUILDER MSH
DUA1800-0AAA04

Power-up The LinkBuilder MSH

When you have completed all stages of installing the MSH as
outlined in this chapter, and have connected all t he cable
segments to your modules, the MSH is ready for operation.
1Check that all connections are secure and that all cables are
terminated correctly.
2To power-up the unit connect the power lead to the IEC socket on
the power inlet panel and plug in to the wall socket. The upper
IEC socket supplies power to the left-hand PSU (P SU 1), the lower
IEC socket supplies to the right-hand PSU (PSU 2). Therefore if you
want to use two PSUs, you must have a power supply to both
sockets.
3When the unit is powered up, the PWR indicator on each module
should light. If they do not, refer to the problem-solving section of
the appropriate user guide.
Storing The User Guides
On the underside of the MSH chassis, there is a storage position
for module user guides (if the cable support tray is fitted, this
holder should be moved. See The Cable Support Tray on page
2-20). You can slide up to four guides into the holder, so that they
are readily available for fault diagnosis and LED interpretation.

Chassis.bk : CHAPTER2 Page 24 Monday, February 10, 1997 1:11 PM